ChargePapa Smart-Link | CCS2 to GB/T DC Adapter 300A (Active Protocol Converter)
Couldn't load pickup availability
Smart-Link Adapter Path
Fast-charge a GB/T DC vehicle from a compatible CCS2 DC source.
CCS2 DC
GB/T 20234.3 DC
DC fast charging only
Active protocol converter
300A · 300kW
CE
Estimated DC Charging Time Reference
These are approximate 0–80% charging-time ranges for a compatible CCS2 DC source → GB/T DC vehicle inlet path. The adapter is rated up to 250A / 1000V DC, but actual speed is still limited by station output, vehicle BMS, battery temperature, state of charge, charging curve, cable path, and session authorization.
| Station class | Typical scenario | Approx. 0–80% charging time |
|---|---|---|
| 50–100kW CCS2 DC charger | Urban, older, or lower-output DC site | About 40–75 minutes |
| 120–180kW CCS2 DC charger | Common highway DC fast charger | About 25–45 minutes |
| 200–250kW CCS2 DC charger | High-power site near adapter ceiling | About 20–40 minutes |
| Above 250kW CCS2 DC site | Adapter / vehicle / session-limited path | Still depends on the adapter ceiling and the vehicle charging curve |
Estimated 0–80% charging time for compatible GB/T DC EVs. This table means charging time, not driving time. Actual time depends on station output, vehicle charging curve, battery temperature, state of charge, cable path, and authorization.


GB/T DC adapter comparison
| Model | Direction | Mode | Rated path |
|---|---|---|---|
| CPCADA0006 This product | CCS2 DC → GB/T vehicle | DC only · active converter | 300A · 300kW |
| CPCADA0007 | GB/T DC → CCS2 vehicle | DC only · active converter | 300A · 300kW |
| CP-AT-ADC-013 / CP-AT-ADC-014 | GB/T DC → CCS2 vehicle | DC only · active converter | 400A · 400kW |
| SKU | CPCADA0006 |
| Charging source | CCS2 DC fast-charging source |
| Vehicle side | GB/T 20234.3 DC vehicle inlet |
| Charging mode | DC fast charging only |
| Converter role | Active protocol converter |
| Rated current | 300A Max |
| Max power output | 300kW |
| Connector standard | CCS2 (IEC 62196-3) to GB/T 20234.3 DC |
| Power source | DC-powered |
| Weather rating | IP54 |
| Certifications | CE Certified |
| Not for | AC charging, CCS1 source, CCS1/CCS2 vehicle inlet, home wallboxes, destination chargers, or reverse-direction charging |
DC-only boundary: use this adapter for compatible CCS2 DC to GB/T DC fast-charging sessions only. It does not support AC charging or reverse-direction charging.
FAQ
No. 300kW is the adapter’s rated ceiling. Actual speed depends on the charger output, vehicle BMS, battery temperature, state of charge, charging curve, and network authorization.
No. This is a DC fast-charging adapter with active protocol conversion. It is not for GB/T AC, Type 2 AC, home wallboxes, destination chargers, or AC Level 2 charging.
Use it when the charging source side is CCS2 DC and the vehicle side is GB/T DC. If your source is GB/T DC and your vehicle uses CCS2, choose the GB/T to CCS2 adapter path instead.
Warranty & Assurance
Warranty & Assurance
2-Year Comprehensive Warranty.
We cover all internal component failures. If a fault occurs, we provide remote diagnosis and free replacement units or parts. No return shipping required for confirmed defects.
Shipping & Lead Time
Shipping & Lead Time
Factory Direct Shipping.
• Processing (QC): 3-5 Business Days
• Global Transit: 8-20 Business Days
• Tracking provided via email upon dispatch.
Global Shipping & Fulfillment
Shipped Direct: Estimated timelines vary by product type.
Total turnaround may vary because product categories have different warehouse stock levels, quality-control procedures, and dispatch preparation cycles before shipment.
Adapters & Accessories
12-22 Business Days
Handling 4-7 business days + transit 8-15 business days.
Portable, Home & DC Chargers
15-29 Business Days
Handling 7-14 business days + transit 8-15 business days.
🏭 The Direct Process
To ensure safety and performance, ChargePapa products go through inspection, preparation, and dispatch coordination before shipment. Different product types may require different warehouse allocation and quality-control turnaround before release.
PART 1 Estimated Handling Time Before Dispatch
Tier 1
Adapters & Accessories
4-7 Business Days
For charging adapters, connector accessories, and related small parts. This handling window remains unchanged.
Tier 2
Portable Chargers, Home Chargers & DC Chargers
7-14 Business Days
For portable EV chargers, home charging stations, and DC charger models including DC SVC-TG and DC EVC-ZG. Additional preparation time is required before dispatch.
PART 2 Transit Time (8-15 Days)
Global Transport
8-15 Days
International transport via Air Freight, Sea Freight, or Land depending on destination and local delivery conditions.
Estimated Timeline by Product Type
Longer total timelines do not mean inactive processing. They reflect differences in stock allocation, warehouse readiness, product inspection workload, and dispatch turnover by category.
| Product Type | Handling Time | Transit Time | Estimated Total |
|---|---|---|---|
| Adapters & Accessories | 4-7 business days | 8-15 business days | 12-22 business days |
| Portable EV Chargers | 7-14 business days | 8-15 business days | 15-29 business days |
| Home Charging Stations | 7-14 business days | 8-15 business days | 15-29 business days |
| DC Chargers / DC SVC-TG / DC EVC-ZG | 7-14 business days | 8-15 business days | 15-29 business days |
Remote Areas & Extended Delivery
Deliveries to remote regions, island destinations, low-frequency carrier zones, or special-route areas may require additional transit time beyond the standard estimate.
Depending on destination access and local logistics availability, shipments may be routed through a combination of air freight, sea freight, and land transport to complete final delivery safely and efficiently.
Logistics & Protection
All international orders are automatically insured against loss or damage. We handle claims with transport partners at no extra cost to you.
We utilize a combination of Air, Sea, and Land transport networks to ensure secure delivery to your specific address.
Tracking numbers are generated after handling is complete. Adapters and accessories usually receive tracking within 4-7 business days, while portable chargers, home charging stations, and DC charger orders may require 7-14 business days before tracking becomes active.
We handle export paperwork. However, specific local import duties or taxes are the recipient's responsibility.
* Product-specific handling times apply before transit begins.
* Orders placed on weekends or holidays will be processed on the next business day.
* Remote regions, islands, and special-route destinations may require additional transit time.
* During high-volume periods such as Black Friday or New Year, handling and transit may require additional time.
* Neither party shall be liable for delays resulting from force majeure events, including natural disasters, strikes, customs holds, or transport disruption.
Need a status check on your order timeline?
Contact our logistics team if your tracking update is taking longer than the estimated handling window for your product type.
✉ info@chargepapa.com
Will this fit my car?
Will this fit my car?
Please verify your car's port type (Type 1 vs Type 2) before purchasing. If unsure, send a photo of your charging port to our chat support.
