Skip to product information
1 of 4

ChargePapa Power-Bridge | NACS to GB/T Adapter (32A / AC 110-250V)

On sale Save $29.00 USD (20% off)
Regular price $114.55 USD
Regular price $143.55 USD Sale price $114.55 USD
Sale Sold out
Shipping calculated at checkout.
Quantity
🛡️ Quality Assurance: Every unit undergoes a rigorous 72-hour high-voltage stress test and thermal calibration before dispatch from our global hub. Safety is our priority; quality is non-negotiable.
✅ CE/TUV Safety Certified
🛡️ 2-Year Replacement Warranty
📦 Free Global Shipping

Power-Bridge | NACS (SAE J3400) → GB/T (GB/T 20234.2) Adapter

The ChargePapa Power-Bridge CP-KL-ADP-025 enables GB/T 20234.2 electric vehicles to charge at NACS (SAE J3400) AC Level 2 stations — including Tesla Wall Connectors, Tesla Destination Chargers, and any third-party NACS-standard AC infrastructure. Ideal for Chinese-standard EV owners accessing the growing NACS charging network in North America, this adapter delivers up to 32A MAX with wide-voltage support from AC 110V to 250V. Built with silver-plated copper alloy conductors and a rugged PC+PA66 housing, it is rated for over 10,000 charge cycles. Verify station compatibility in the vehicle manufacturer’s app before route planning — physical connector fit is only one requirement; session authorization is separate.

ℹ️ AC Charging Adapter — Not for DC Fast Charging

This is an AC Level 2 charging adapter (32A / AC 110-250V). It is not a DC fast charging adapter. For GB/T DC fast charging solutions, please refer to ChargePapa’s DC-Link series.

Engineering Data Sheet
SKU CP-KL-ADP-025
Input Connector SAE J3400 NACS (Female) — Station Side
Output Connector GB/T 20234.2 (Male) — Vehicle Side
Working Voltage AC 110V ~ 250V (Wide Voltage)
Rated Current 32A MAX
Max Power Output ~7.4 kW @ 230V · ~3.5 kW @ 110V (Single-phase)
Phase Type Single-phase
Terminal Temp Rise <50K
Case Material PC + PA66
Conductor Material Copper alloy with silver plating
Insertion Force 45N < F < 100N
Plug/Unplug Life >10,000 cycles
Product Dimensions 165.7 × 70.0 × 69.9 mm
Working Temperature -30°C to +50°C (-22°F to +122°F)
Working Humidity 5% ~ 95% RH
Working Altitude ≤2000m
Compatibility
Station Side (Input) Vehicle Side (Output) Charging Type
NACS (SAE J3400) AC Station GB/T 20234.2 EV Port AC Level 2 Only
Compatible with GB/T 20234.2 electric vehicles including BYD Atto 3, BYD Han, BYD Seal, NIO ES6, NIO ET7, Xpeng P7, Li Auto L9, and other Chinese-standard EVs. Can enable access at compatible, authorized NACS AC Level 2 stations — including Tesla Wall Connectors and Destination Charger sites — when the vehicle, station, and adapter path are supported. Verify station compatibility in the vehicle manufacturer’s app before route planning. Physical connector fit is only one requirement; session authorization is separate.
✅ Standards & Certifications

CE — Conformité Européenne: Meets EU safety, health, and environmental protection requirements.

FCC — Federal Communications Commission: Compliant with electromagnetic interference standards for use in North America.

Frequently Asked Questions

Q: Which vehicles are compatible with the CP-KL-ADP-025?

A: Any EV with a GB/T 20234.2 port — including BYD Atto 3, BYD Han, BYD Seal, NIO ES6, NIO ET7, Xpeng P7, Li Auto L9, and other Chinese-standard EVs. This adapter is not intended for Tesla or other NACS-native vehicles.

Q: Which charging stations does the CP-KL-ADP-025 work with?

A: Can enable access at compatible, authorized NACS (SAE J3400) AC Level 2 stations — including Tesla Wall Connectors and Destination Charger sites — when the vehicle, station, and adapter path are supported. Verify station compatibility in the vehicle manufacturer’s app before route planning. Physical connector fit is only one requirement; session authorization is separate. Does NOT work with Tesla Superchargers (DC fast charging).

Q: Is this the same as the ChargePapa DC-Link NACS to GB/T adapter?

A: No. The DC-Link series is designed for DC fast charging (300A / 1000V). The CP-KL-ADP-025 Power-Bridge is an AC Level 2 adapter (32A / AC 110-250V) for standard AC charging stations.

Q: What is the maximum charging speed?

A: Up to 32A MAX — approximately 7.4 kW at 230V or 3.5 kW at 110V. Actual speed depends on your vehicle’s onboard charger capacity and the station’s output rating.

⚠️ Critical Usage Note

This adapter is designed for AC Level 2 single-phase charging only. Do not use with DC fast chargers or Tesla Superchargers.

Always verify that your charging station output does not exceed 32A / 250V before use.

Warranty & Assurance

2-Year Comprehensive Warranty.
We cover all internal component failures. If a fault occurs, we provide remote diagnosis and free replacement units or parts. No return shipping required for confirmed defects.

Shipping & Lead Time

Factory Direct Shipping.
• Processing (QC): 3-5 Business Days
• Global Transit: 8-20 Business Days
• Tracking provided via email upon dispatch.

Global Shipping & Fulfillment

Shipped Direct: Estimated timelines vary by product type.

Total turnaround may vary because product categories have different warehouse stock levels, quality-control procedures, and dispatch preparation cycles before shipment.

Adapters & Accessories

12-22 Business Days

Handling 4-7 business days + transit 8-15 business days.

Portable, Home & DC Chargers

15-29 Business Days

Handling 7-14 business days + transit 8-15 business days.

🏭 The Direct Process

To ensure safety and performance, ChargePapa products go through inspection, preparation, and dispatch coordination before shipment. Different product types may require different warehouse allocation and quality-control turnaround before release.

PART 1 Estimated Handling Time Before Dispatch

Tier 1

Adapters & Accessories

4-7 Business Days

For charging adapters, connector accessories, and related small parts. This handling window remains unchanged.

Tier 2

Portable Chargers, Home Chargers & DC Chargers

7-14 Business Days

For portable EV chargers, home charging stations, and DC charger models including DC SVC-TG and DC EVC-ZG. Additional preparation time is required before dispatch.

PART 2 Transit Time (8-15 Days)

Global Transport

8-15 Days

International transport via Air Freight, Sea Freight, or Land depending on destination and local delivery conditions.

Estimated Timeline by Product Type

Longer total timelines do not mean inactive processing. They reflect differences in stock allocation, warehouse readiness, product inspection workload, and dispatch turnover by category.

Product Type Handling Time Transit Time Estimated Total
Adapters & Accessories 4-7 business days 8-15 business days 12-22 business days
Portable EV Chargers 7-14 business days 8-15 business days 15-29 business days
Home Charging Stations 7-14 business days 8-15 business days 15-29 business days
DC Chargers / DC SVC-TG / DC EVC-ZG 7-14 business days 8-15 business days 15-29 business days

Remote Areas & Extended Delivery

Deliveries to remote regions, island destinations, low-frequency carrier zones, or special-route areas may require additional transit time beyond the standard estimate.

Depending on destination access and local logistics availability, shipments may be routed through a combination of air freight, sea freight, and land transport to complete final delivery safely and efficiently.

Logistics & Protection

Global Shipping Protection (Included)

All international orders are automatically insured against loss or damage. We handle claims with transport partners at no extra cost to you.

Multi-Modal Transport

We utilize a combination of Air, Sea, and Land transport networks to ensure secure delivery to your specific address.

Tracking Information

Tracking numbers are generated after handling is complete. Adapters and accessories usually receive tracking within 4-7 business days, while portable chargers, home charging stations, and DC charger orders may require 7-14 business days before tracking becomes active.

Customs & Duties

We handle export paperwork. However, specific local import duties or taxes are the recipient's responsibility.

* Product-specific handling times apply before transit begins.

* Orders placed on weekends or holidays will be processed on the next business day.

* Remote regions, islands, and special-route destinations may require additional transit time.

* During high-volume periods such as Black Friday or New Year, handling and transit may require additional time.

* Neither party shall be liable for delays resulting from force majeure events, including natural disasters, strikes, customs holds, or transport disruption.

Need a status check on your order timeline?

Contact our logistics team if your tracking update is taking longer than the estimated handling window for your product type.

✉ info@chargepapa.com

Will this fit my car?

Please verify your car's port type (Type 1 vs Type 2) before purchasing. If unsure, send a photo of your charging port to our chat support.

View full details