ChargePapa Knowledge Hub
Tesla Model 3 vs. Model Y: Why the 48A Home Upg...
Is 32A enough for your Tesla, or is it time to upgrade to 48A (11.5kW)? We analyze the technical limits of the Model 3 and Model Y onboard chargers, calculate...
Tesla Model 3 vs. Model Y: Why the 48A Home Upg...
Is 32A enough for your Tesla, or is it time to upgrade to 48A (11.5kW)? We analyze the technical limits of the Model 3 and Model Y onboard chargers, calculate...
Tesla Superchargers are Opening: Is Your Non-Te...
The North American charging landscape is shifting to NACS (J3400). With Tesla Superchargers now accessible to Ford, Rivian, and GM owners, the right adapter is no longer just a luxury—it's...
Tesla Superchargers are Opening: Is Your Non-Te...
The North American charging landscape is shifting to NACS (J3400). With Tesla Superchargers now accessible to Ford, Rivian, and GM owners, the right adapter is no longer just a luxury—it's...
EV Charging in Sub-Zero Temps: Why Your Cable M...
Winter can drop EV charging efficiency by up to 30%. Learn the science of battery pre-conditioning, why ChargePapa’s TPU cables are superior to PVC in freezing temperatures, and industrial pro-tips...
EV Charging in Sub-Zero Temps: Why Your Cable M...
Winter can drop EV charging efficiency by up to 30%. Learn the science of battery pre-conditioning, why ChargePapa’s TPU cables are superior to PVC in freezing temperatures, and industrial pro-tips...
Home Charger Installation Protocol: 7kW to 22kW...
Technical protocol for installing ChargePapa Home Stations. Includes US/EU wiring diagrams (TN-S/Split-Phase), wire gauge tables (AWG/mm²), and breaker sizing for 7kW, 11kW, and 22kW loads.
Home Charger Installation Protocol: 7kW to 22kW...
Technical protocol for installing ChargePapa Home Stations. Includes US/EU wiring diagrams (TN-S/Split-Phase), wire gauge tables (AWG/mm²), and breaker sizing for 7kW, 11kW, and 22kW loads.
How to Prepare for Home EV Charger Installation...
Don't call the electrician yet. Read this pre-installation checklist to understand load calculations, NEMA outlet placement, and wire gauge requirements.
How to Prepare for Home EV Charger Installation...
Don't call the electrician yet. Read this pre-installation checklist to understand load calculations, NEMA outlet placement, and wire gauge requirements.
Before You Buy a Movable DC Fast Charger: A Che...
Movable DC chargers (20kW-40kW) are powerful industrial tools. This guide covers the input power requirements (3-Phase) and weight considerations before you place an order.
Before You Buy a Movable DC Fast Charger: A Che...
Movable DC chargers (20kW-40kW) are powerful industrial tools. This guide covers the input power requirements (3-Phase) and weight considerations before you place an order.