Skip to product information
1 of 6

ChargePapa Smart-Link | GB/T to CCS1 DC Adapter (250A / Active Protocol Converter )

On sale Save $140.00 USD (11% off)
Regular price $1,118.60 USD
Regular price $1,258.60 USD Sale price $1,118.60 USD
Sale Sold out
Shipping calculated at checkout.
Quantity
🛡️ Quality Assurance: Every unit undergoes a rigorous 72-hour high-voltage stress test and thermal calibration before dispatch from our global hub. Safety is our priority; quality is non-negotiable.
✅ CE/TUV Safety Certified
🛡️ 2-Year Replacement Warranty
📦 Free Global Shipping

Smart-Link Adapter Path

Fast-charge a CCS1 DC vehicle from a compatible GB/T DC source.

🔌
Charging source

GB/T 20234.3 DC

🚗
Vehicle inlet

CCS1 DC

Charging role

DC fast charging only

🔁
Converter type

Active protocol converter

📏
Rated ceiling

250A · 250kW

🛡️
Certifications

CE

Estimated DC Charging Time Reference

These are approximate 0–80% charging-time ranges for a compatible GB/T DC source → CCS1 vehicle inlet path. The adapter is rated up to 250A / 1000V DC, but actual speed is still limited by station output, vehicle BMS, battery temperature, state of charge, charging curve, cable path, and session authorization.

Station class Typical scenario Approx. 0–80% charging time
50–100kW GB/T DC charger Urban, older, or lower-output DC site About 40–75 minutes
120–180kW GB/T DC charger Common highway DC fast charger About 25–45 minutes
200–250kW GB/T DC charger High-power site near adapter ceiling About 20–40 minutes
Above 250kW GB/T DC site Adapter / vehicle / session-limited path Still depends on the adapter ceiling and the vehicle charging curve

Estimated 0–80% charging time for compatible CCS1 EVs. This table means charging time, not driving time. Actual time depends on station output, vehicle charging curve, battery temperature, state of charge, cable path, and authorization.

GB/T to CCS1 Smart-Link adapter factory top-down view
GB/T to CCS1 DC adapter product reference

GB/T DC adapter comparison

Model Direction Mode Rated path
CP-AT-ADC-005 This product GB/T DC → CCS1 vehicle DC only · active converter 250A · 250kW
CP-AT-ADC-004 CCS1 DC → GB/T vehicle DC only · active converter 300A · 300kW
CPCADA0007 GB/T DC → CCS2 vehicle DC only · active converter 300A · 300kW
Full Specs — For the Detail-Oriented
SKU CP-AT-ADC-005
Charging source GB/T 20234.3 DC fast-charging source
Vehicle side CCS1 DC vehicle inlet
Charging mode DC fast charging only
Converter role Active protocol converter
Rated current 250A
Max power output 250kW
Connector path GB/T 20234.3 DC to CCS1 (SAE J1772 Combo)
Certifications CE Certified
Not for AC charging, CCS1 source, GB/T vehicle inlet, home wallboxes, destination chargers, or reverse-direction charging

DC-only boundary: use this adapter for compatible GB/T DC to CCS1 DC fast-charging sessions only. It does not support AC charging or reverse-direction charging.

FAQ

Will this adapter make my CCS1 EV charge at 250kW?

No. 250kW is the adapter’s rated ceiling. Actual speed depends on the charger output, vehicle BMS, battery temperature, state of charge, charging curve, and network authorization.

Is this adapter for AC charging?

No. This is a DC fast-charging adapter with active protocol conversion. It is not for GB/T AC, J1772 AC, home wallboxes, destination chargers, or AC Level 2 charging.

Which direction is this adapter?

Use it when the charging source side is GB/T DC and the vehicle side is CCS1 DC. If your source is CCS1 DC and your vehicle uses GB/T, choose the CCS1 to GB/T adapter path instead.

Warranty & Assurance

2-Year Comprehensive Warranty.
We cover all internal component failures. If a fault occurs, we provide remote diagnosis and free replacement units or parts. No return shipping required for confirmed defects.

Shipping & Lead Time

Factory Direct Shipping.
• Processing (QC): 3-5 Business Days
• Global Transit: 8-20 Business Days
• Tracking provided via email upon dispatch.

Global Shipping & Fulfillment

Shipped Direct: Estimated timelines vary by product type.

Total turnaround may vary because product categories have different warehouse stock levels, quality-control procedures, and dispatch preparation cycles before shipment.

Adapters & Accessories

12-22 Business Days

Handling 4-7 business days + transit 8-15 business days.

Portable, Home & DC Chargers

15-29 Business Days

Handling 7-14 business days + transit 8-15 business days.

🏭 The Direct Process

To ensure safety and performance, ChargePapa products go through inspection, preparation, and dispatch coordination before shipment. Different product types may require different warehouse allocation and quality-control turnaround before release.

PART 1 Estimated Handling Time Before Dispatch

Tier 1

Adapters & Accessories

4-7 Business Days

For charging adapters, connector accessories, and related small parts. This handling window remains unchanged.

Tier 2

Portable Chargers, Home Chargers & DC Chargers

7-14 Business Days

For portable EV chargers, home charging stations, and DC charger models including DC SVC-TG and DC EVC-ZG. Additional preparation time is required before dispatch.

PART 2 Transit Time (8-15 Days)

Global Transport

8-15 Days

International transport via Air Freight, Sea Freight, or Land depending on destination and local delivery conditions.

Estimated Timeline by Product Type

Longer total timelines do not mean inactive processing. They reflect differences in stock allocation, warehouse readiness, product inspection workload, and dispatch turnover by category.

Product Type Handling Time Transit Time Estimated Total
Adapters & Accessories 4-7 business days 8-15 business days 12-22 business days
Portable EV Chargers 7-14 business days 8-15 business days 15-29 business days
Home Charging Stations 7-14 business days 8-15 business days 15-29 business days
DC Chargers / DC SVC-TG / DC EVC-ZG 7-14 business days 8-15 business days 15-29 business days

Remote Areas & Extended Delivery

Deliveries to remote regions, island destinations, low-frequency carrier zones, or special-route areas may require additional transit time beyond the standard estimate.

Depending on destination access and local logistics availability, shipments may be routed through a combination of air freight, sea freight, and land transport to complete final delivery safely and efficiently.

Logistics & Protection

Global Shipping Protection (Included)

All international orders are automatically insured against loss or damage. We handle claims with transport partners at no extra cost to you.

Multi-Modal Transport

We utilize a combination of Air, Sea, and Land transport networks to ensure secure delivery to your specific address.

Tracking Information

Tracking numbers are generated after handling is complete. Adapters and accessories usually receive tracking within 4-7 business days, while portable chargers, home charging stations, and DC charger orders may require 7-14 business days before tracking becomes active.

Customs & Duties

We handle export paperwork. However, specific local import duties or taxes are the recipient's responsibility.

* Product-specific handling times apply before transit begins.

* Orders placed on weekends or holidays will be processed on the next business day.

* Remote regions, islands, and special-route destinations may require additional transit time.

* During high-volume periods such as Black Friday or New Year, handling and transit may require additional time.

* Neither party shall be liable for delays resulting from force majeure events, including natural disasters, strikes, customs holds, or transport disruption.

Need a status check on your order timeline?

Contact our logistics team if your tracking update is taking longer than the estimated handling window for your product type.

✉ info@chargepapa.com

Will this fit my car?

Please verify your car's port type (Type 1 vs Type 2) before purchasing. If unsure, send a photo of your charging port to our chat support.

View full details