Skip to product information
1 of 2

ChargePapa Omni-Link | Tesla to GB/T AC Adapter (80A Max / For China Spec EVs)

ChargePapa Omni-Link | Tesla to GB/T AC Adapter (80A Max / For China Spec EVs)

Regular price $149.00 USD
Regular price Sale price $149.00 USD
Sale Sold out
Shipping calculated at checkout.
Quantity
🛡️ Quality Assurance: Every unit undergoes a rigorous 72-hour high-voltage stress test and thermal calibration before dispatch from our global hub. Safety is our priority; quality is non-negotiable.
✅ CE/TUV Safety Certified
🛡️ 2-Year Replacement Warranty
📦 Free Global Shipping

Power Chinese EVs with Tesla.
80A High-Capacity Link.

Driving a Chinese-spec BYD, NIO, or Xpeng in North America? The ChargePapa Omni-Link (Tesla to GB/T) allows you to charge your GB/T vehicle using any Tesla Wall Connector or Mobile Connector. Engineered for performance, it supports up to 80 Amps (19kW), providing maximum charging speed with superior thermal stability compared to standard 40A adapters.

🔌 Conversion Logic

Input (Charger)

Tesla Wall/Dest. Charger

Output (Vehicle)

China Standard GB/T AC

Engineering Data Sheet
Rated Current 80A Max
Operating Voltage up to 250V AC
Max Power Up to 19kW
Pin Material Silver-Plated Copper
Housing Standard UL94 V-0
Operating Temp -22°F to +122°F
💡 Vehicle & Station Check
  • Vehicle: Works with BYD (Han/Tang/Atto 3), NIO, Xpeng, and Zeekr imported to the US (GB/T Port).
  • Station: Works with Tesla Wall Connectors (Gen 1/2/3) and Destination Chargers.
  • Restriction: NOT for Tesla Superchargers. AC Charging Only.

Warranty & Assurance

2-Year Comprehensive Warranty.
We cover all internal component failures. If a fault occurs, we provide remote diagnosis and free replacement units or parts. No return shipping required for confirmed defects.

Shipping & Lead Time

Factory Direct Shipping.
• Processing (QC): 3-5 Business Days
• Global Transit: 8-15 Business Days
• Tracking provided via email upon dispatch.

Global Shipping & Fulfillment

Factory Direct Logistics: Estimated Total Turnaround 11-20 Business Days.

🏭 Why the wait? (The Factory Direct Model)

Unlike generic retailers who ship off-the-shelf units, every ChargePapa station undergoes a final load-testing sequence before dispatch. By shipping directly from our manufacturing hub, we ensure you receive a freshly calibrated unit at wholesale pricing.

Fulfillment Timeline

PHASE 1

Processing & QC

3-5 Days

Bench testing, Safety Check, Packing.

PHASE 2

Global Transit

8-15 Days

Air Freight / Express Logistics.

TOTAL

Delivery Estimate

11-20 Days

Business Days (Mon-Fri).

Logistics Details

  • Free Shipping: Standard international shipping is included in the price.

* Orders placed on weekends or holidays will be processed the following business day.  During high-volume periods (like Valentine's Day, Black Friday or New Year), processing may extra days.

* Neither party shall be liable for delays or failures in performance resulting from force majeure events, including but not limited to natural disasters, strikes, customs holds, or other logistical disruptions beyond either party’s reasonable control.

  • Tracking: Tracking numbers are generated *after* Phase 1 (Quality Check) is complete. Please allow up to 5 days to receive your code.
  • Customs: We handle most paperwork, but specific local import duties (if any) are the recipient's responsibility.

Tracking update taking longer than 7 days?

✉ info@chargepapa.com

Will this fit my car?

Please verify your car's port type (Type 1 vs Type 2) before purchasing. If unsure, send a photo of your charging port to our chat support.

View full details