ChargePapa DC-Link | CCS1 to CCS2 AC/DC Dual-Mode Adapter (250A DC / 80A AC)
Couldn't load pickup availability
DC-Link / Dual-Mode Adapter Path
Use CCS1 DC fast chargers or J1772 AC charging sources with a CCS2 vehicle.
CCS1 Combo DC or SAE J1772 Type 1 AC
CCS2 vehicle inlet
AC/DC dual-mode
250kW / 250A DC · 19.2kW / 80A AC · IP54
CE
Estimated DC Charging Time Reference
These are approximate 0–80% charging-time ranges for a compatible CCS1 DC source → CCS2 vehicle inlet path. The adapter is rated up to 250A / 1000V DC, but actual speed is still limited by station output, vehicle BMS, battery temperature, state of charge, charging curve, cable path, and session authorization.
| Station class | Typical scenario | Approx. 0–80% charging time |
|---|---|---|
| 50–100kW CCS1 DC charger | Urban, older, or lower-output DC site | About 40–75 minutes |
| 120–180kW CCS1 DC charger | Common highway DC fast charger | About 25–45 minutes |
| 200–250kW CCS1 DC charger | High-power site near adapter ceiling | About 20–40 minutes |
| Above 250kW CCS1 DC site | Adapter / vehicle / session-limited path | Still depends on the adapter ceiling and the vehicle charging curve |
Estimated 0–80% charging time for compatible CCS2 EVs. This table means charging time, not driving time. Actual time depends on station output, vehicle charging curve, battery temperature, state of charge, cable path, and authorization.
AC Charging Reference
On the AC path, this adapter is rated up to 80A / 250V AC / 19.2kW. It does not increase charging power. Actual AC charging speed depends on the Type 1 / J1772 source, circuit capacity, cable path, and the vehicle onboard AC charger.
CCS1 / CCS2 adapter comparison
| Model | Direction | Mode | Rated path |
|---|---|---|---|
| CP-KL-ADP-004 | CCS1 DC fast charger → CCS2 vehicle inlet | DC only | 400A · 1000V DC |
| CPCADA0002 | CCS2 DC fast charger → CCS1 vehicle inlet | DC only | 250kW · 250A |
| CP-AT-ADC-006 This product | CCS1 DC or Type 1 AC source → CCS2 vehicle inlet | AC/DC dual-mode | 250kW / 250A DC · 19.2kW / 80A AC |
| CP-KL-C2-C1 | CCS2 DC or Type 2 AC source → CCS1 vehicle inlet | AC/DC dual-mode | 250A rated / 300A peak DC · 80A AC · IP65 |
| SKU | CP-AT-ADC-006 |
| Charging source | CCS1 Combo DC source or SAE J1772 Type 1 AC source |
| Vehicle side | CCS2 vehicle inlet |
| Charging mode | AC/DC dual-mode adapter |
| DC rated path | up to 250kW / 250A DC |
| AC rated path | up to 19.2kW / 80A / 250V AC |
| Weather rating | IP54 |
| Connector standard | CCS1 (SAE J1772 Combo) → CCS2 (IEC 62196-2 Combo 2) |
| Certifications | CE |
AC/DC boundary: use the DC path only with compatible CCS1 DC fast-charging sessions, and use the AC path only with compatible SAE J1772 Type 1 AC sources. This adapter does not reverse the direction or override charger, vehicle, cable, BMS, or network authorization limits.
FAQ
No. This is an AC/DC dual-mode adapter. The DC path is for compatible CCS1 DC fast-charging sources, and the AC path is for compatible SAE J1772 Type 1 AC charging sources.
No. DC and AC ratings are separate. The DC path is rated up to 250kW / 250A DC, while the AC path is rated up to 19.2kW / 80A / 250V AC.
Use it when the charging source side is CCS1 Combo DC or SAE J1772 Type 1 AC, and the vehicle side is CCS2. It is not for charging a CCS1 vehicle from a CCS2 source.
Warranty & Assurance
Warranty & Assurance
2-Year Comprehensive Warranty.
We cover all internal component failures. If a fault occurs, we provide remote diagnosis and free replacement units or parts. No return shipping required for confirmed defects.
Shipping & Lead Time
Shipping & Lead Time
Factory Direct Shipping.
• Processing (QC): 3-5 Business Days
• Global Transit: 8-20 Business Days
• Tracking provided via email upon dispatch.
Global Shipping & Fulfillment
Shipped Direct: Estimated timelines vary by product type.
Total turnaround may vary because product categories have different warehouse stock levels, quality-control procedures, and dispatch preparation cycles before shipment.
Adapters & Accessories
12-22 Business Days
Handling 4-7 business days + transit 8-15 business days.
Portable, Home & DC Chargers
15-29 Business Days
Handling 7-14 business days + transit 8-15 business days.
🏭 The Direct Process
To ensure safety and performance, ChargePapa products go through inspection, preparation, and dispatch coordination before shipment. Different product types may require different warehouse allocation and quality-control turnaround before release.
PART 1 Estimated Handling Time Before Dispatch
Tier 1
Adapters & Accessories
4-7 Business Days
For charging adapters, connector accessories, and related small parts. This handling window remains unchanged.
Tier 2
Portable Chargers, Home Chargers & DC Chargers
7-14 Business Days
For portable EV chargers, home charging stations, and DC charger models including DC SVC-TG and DC EVC-ZG. Additional preparation time is required before dispatch.
PART 2 Transit Time (8-15 Days)
Global Transport
8-15 Days
International transport via Air Freight, Sea Freight, or Land depending on destination and local delivery conditions.
Estimated Timeline by Product Type
Longer total timelines do not mean inactive processing. They reflect differences in stock allocation, warehouse readiness, product inspection workload, and dispatch turnover by category.
| Product Type | Handling Time | Transit Time | Estimated Total |
|---|---|---|---|
| Adapters & Accessories | 4-7 business days | 8-15 business days | 12-22 business days |
| Portable EV Chargers | 7-14 business days | 8-15 business days | 15-29 business days |
| Home Charging Stations | 7-14 business days | 8-15 business days | 15-29 business days |
| DC Chargers / DC SVC-TG / DC EVC-ZG | 7-14 business days | 8-15 business days | 15-29 business days |
Remote Areas & Extended Delivery
Deliveries to remote regions, island destinations, low-frequency carrier zones, or special-route areas may require additional transit time beyond the standard estimate.
Depending on destination access and local logistics availability, shipments may be routed through a combination of air freight, sea freight, and land transport to complete final delivery safely and efficiently.
Logistics & Protection
All international orders are automatically insured against loss or damage. We handle claims with transport partners at no extra cost to you.
We utilize a combination of Air, Sea, and Land transport networks to ensure secure delivery to your specific address.
Tracking numbers are generated after handling is complete. Adapters and accessories usually receive tracking within 4-7 business days, while portable chargers, home charging stations, and DC charger orders may require 7-14 business days before tracking becomes active.
We handle export paperwork. However, specific local import duties or taxes are the recipient's responsibility.
* Product-specific handling times apply before transit begins.
* Orders placed on weekends or holidays will be processed on the next business day.
* Remote regions, islands, and special-route destinations may require additional transit time.
* During high-volume periods such as Black Friday or New Year, handling and transit may require additional time.
* Neither party shall be liable for delays resulting from force majeure events, including natural disasters, strikes, customs holds, or transport disruption.
Need a status check on your order timeline?
Contact our logistics team if your tracking update is taking longer than the estimated handling window for your product type.
✉ info@chargepapa.com
Will this fit my car?
Will this fit my car?
Please verify your car's port type (Type 1 vs Type 2) before purchasing. If unsure, send a photo of your charging port to our chat support.
