ChargePapa Power-Bridge | Type 2 to GB/T Single-phase Adapter
Couldn't load pickup availability
Power-Bridge | Type 2 → GB/T Single-phase Adapter
The ChargePapa Power-Bridge CP-KL-ADP-020 bridges IEC 62196-2 Type 2 charging infrastructure with GB/T-standard electric vehicles, delivering up to 32A of single-phase AC power. Built with copper alloy conductors and silver plating, it is engineered for reliability across thousands of charge cycles — whether at a public station or a private wallbox.
Step 1 · Confirm your connector match
✅ Station side: Type 2 (IEC 62196-2)
Public AC posts & home wallboxes with a Type 2 socket — the standard across Europe, UK & AU.
✅ Vehicle side: GB/T (20234.2)
GB/T-standard EVs — BYD, NIO, XPENG, Li Auto, SAIC, Geely and other Chinese-standard cars.
Step 2 · Match your power & charging scenario
| 🏠 |
Home outlet / low-voltage grid Single-phase AC 110–120V supply, everyday overnight charging. |
~3.5 kW 32A @ 110V · CP-KL-ADP-020 |
| 🔌 |
Home wallbox / public AC post Single-phase AC 230V supply, the most common Level 2 scenario. |
~7.4 kW 32A @ 230V · CP-KL-ADP-020 |
| ⚡ |
High-current single-phase wallbox Single-phase AC up to 250V, fastest AC charging this adapter supports. |
up to ~8.0 kW 32A @ 250V · CP-KL-ADP-020 |
Not sure which applies to you? Check your electrician’s label or charger spec sheet for the supply voltage. Household outlets are typically 110–120V (North America) or 220–250V (Europe/UK/AU). This adapter is single-phase, AC Level 2 only — it will not increase output beyond what your vehicle’s onboard charger and the station can deliver.
| SKU | CP-KL-ADP-020 |
| Input Connector | IEC 62196-2 Type 2 (Female) |
| Output Connector | GB/T 20234.2 (Male) |
| Working Voltage | AC 110V~250V |
| Rated Current | 32A MAX |
| Max Power Output | ~3.5 kW (110V) – ~8.0 kW (250V), single-phase |
| Phase Type | Single-phase |
| Terminal Temp Rise | <50K |
| Case Material | PC + PA66 |
| Conductor Material | Copper alloy with silver plating |
| Insertion Force | 45N < F < 100N |
| Plug/Unplug Life | >10,000 cycles |
| Working Temperature | -30°C to +50°C (-22°F to +122°F) |
| Working Humidity | 5% ~ 95% RH |
| Working Altitude | ≤2000m |
| Station Side (Input) | Vehicle Side (Output) | Charging Type |
|---|---|---|
| IEC 62196-2 Type 2 AC Station | GB/T 20234.2 EV Port | AC Level 2 Only |
| Compatible with GB/T-standard EVs including BYD, NIO, XPENG, Li Auto, SAIC, Geely, and other Chinese-standard vehicles. | ||
CE — Conformité Européenne: Meets EU safety, health, and environmental protection requirements for electrical equipment.
FCC — Federal Communications Commission: Compliant with electromagnetic interference standards for use in North America.
Q: Is the CP-KL-ADP-020 compatible with BYD, NIO, and other GB/T-standard EVs?
A: Yes. The ChargePapa Power-Bridge CP-KL-ADP-020 is fully compatible with all GB/T 20234.2-standard electric vehicles, including BYD, NIO, XPENG, Li Auto, SAIC, and Geely models. It connects any IEC 62196-2 Type 2 AC charging station to your GB/T vehicle port.
Q: What is the maximum charging speed with the CP-KL-ADP-020?
A: The ChargePapa Power-Bridge supports up to 32A across an AC 110V~250V range, delivering approximately 3.5 kW at 110V and up to 8.0 kW at 250V on a single-phase circuit. Actual charging speed depends on your vehicle's onboard charger capacity and the station's output rating.
Q: How does this compare to a standard 16A Type 2 to GB/T adapter?
A: Compared to standard 16A adapters, the ChargePapa CP-KL-ADP-020 delivers 100% more current capacity at 32A MAX, cutting charge time significantly for vehicles that support higher AC input. The silver-plated copper alloy conductors also ensure lower contact resistance and better thermal performance over time.
Q: Is this adapter CE and FCC certified?
A: Yes. The CP-KL-ADP-020 carries CE (Conformité Européenne) certification for EU safety and environmental compliance, and FCC (Federal Communications Commission) certification for electromagnetic compatibility in North America.
Q: Does this adapter support DC fast charging?
A: No. The CP-KL-ADP-020 supports AC Level 2 single-phase charging only. For DC fast charging solutions, please refer to ChargePapa's DC-Link adapter series.
Q: How durable is this adapter and what is its rated lifespan?
A: The ChargePapa CP-KL-ADP-020 is rated for over 10,000 plug/unplug cycles. Its PC+PA66 housing withstands operating temperatures from -30°C to +50°C and humidity up to 95% RH, making it suitable for year-round outdoor use at altitudes up to 2,000 meters.
This adapter is designed for AC Level 2 single-phase charging only. Do not use with DC fast chargers or three-phase AC stations.
Always verify that your charging station output does not exceed 32A / 250V before use. Exceeding rated parameters may cause damage and will void the warranty.
Warranty & Assurance
Warranty & Assurance
2-Year Comprehensive Warranty.
We cover all internal component failures. If a fault occurs, we provide remote diagnosis and free replacement units or parts. No return shipping required for confirmed defects.
Shipping & Lead Time
Shipping & Lead Time
Factory Direct Shipping.
• Processing (QC): 3-5 Business Days
• Global Transit: 8-20 Business Days
• Tracking provided via email upon dispatch.
Global Shipping & Fulfillment
Shipped Direct: Estimated timelines vary by product type.
Total turnaround may vary because product categories have different warehouse stock levels, quality-control procedures, and dispatch preparation cycles before shipment.
Adapters & Accessories
12-22 Business Days
Handling 4-7 business days + transit 8-15 business days.
Portable, Home & DC Chargers
15-29 Business Days
Handling 7-14 business days + transit 8-15 business days.
🏭 The Direct Process
To ensure safety and performance, ChargePapa products go through inspection, preparation, and dispatch coordination before shipment. Different product types may require different warehouse allocation and quality-control turnaround before release.
PART 1 Estimated Handling Time Before Dispatch
Tier 1
Adapters & Accessories
4-7 Business Days
For charging adapters, connector accessories, and related small parts. This handling window remains unchanged.
Tier 2
Portable Chargers, Home Chargers & DC Chargers
7-14 Business Days
For portable EV chargers, home charging stations, and DC charger models including DC SVC-TG and DC EVC-ZG. Additional preparation time is required before dispatch.
PART 2 Transit Time (8-15 Days)
Global Transport
8-15 Days
International transport via Air Freight, Sea Freight, or Land depending on destination and local delivery conditions.
Estimated Timeline by Product Type
Longer total timelines do not mean inactive processing. They reflect differences in stock allocation, warehouse readiness, product inspection workload, and dispatch turnover by category.
| Product Type | Handling Time | Transit Time | Estimated Total |
|---|---|---|---|
| Adapters & Accessories | 4-7 business days | 8-15 business days | 12-22 business days |
| Portable EV Chargers | 7-14 business days | 8-15 business days | 15-29 business days |
| Home Charging Stations | 7-14 business days | 8-15 business days | 15-29 business days |
| DC Chargers / DC SVC-TG / DC EVC-ZG | 7-14 business days | 8-15 business days | 15-29 business days |
Remote Areas & Extended Delivery
Deliveries to remote regions, island destinations, low-frequency carrier zones, or special-route areas may require additional transit time beyond the standard estimate.
Depending on destination access and local logistics availability, shipments may be routed through a combination of air freight, sea freight, and land transport to complete final delivery safely and efficiently.
Logistics & Protection
All international orders are automatically insured against loss or damage. We handle claims with transport partners at no extra cost to you.
We utilize a combination of Air, Sea, and Land transport networks to ensure secure delivery to your specific address.
Tracking numbers are generated after handling is complete. Adapters and accessories usually receive tracking within 4-7 business days, while portable chargers, home charging stations, and DC charger orders may require 7-14 business days before tracking becomes active.
We handle export paperwork. However, specific local import duties or taxes are the recipient's responsibility.
* Product-specific handling times apply before transit begins.
* Orders placed on weekends or holidays will be processed on the next business day.
* Remote regions, islands, and special-route destinations may require additional transit time.
* During high-volume periods such as Black Friday or New Year, handling and transit may require additional time.
* Neither party shall be liable for delays resulting from force majeure events, including natural disasters, strikes, customs holds, or transport disruption.
Need a status check on your order timeline?
Contact our logistics team if your tracking update is taking longer than the estimated handling window for your product type.
✉ info@chargepapa.com
Will this fit my car?
Will this fit my car?
Please verify your car's port type (Type 1 vs Type 2) before purchasing. If unsure, send a photo of your charging port to our chat support.
