ChargePapa Omni-Link | Type 2 to GB/T Right Angle Adapter Pro (3-Phase 22kW / 50A Max)
Couldn't load pickup availability
Unlock 22kW 3-Phase AC Charging for Your Chinese EV in Europe
The ChargePapa Omni-Link Pro bridges European Type 2 (IEC 62196-2) three-phase charging infrastructure with Chinese GB/T AC-standard vehicles — including BYD, NIO, Zeekr, and other GB/T-equipped EVs. Rated at 50A Max / 380V–450V AC / Three Phase (L1+L2+L3) with IP54 weather protection and an ergonomic right-angle design, it delivers up to 22kW for vehicles with three-phase onboard chargers. Built with PC+PA66+GF25% flame-retardant housing, silver-plated copper pins, and >10,000 mechanical cycle life.

Conversion Direction
Type 2 / IEC 62196-2 Charging Station (Europe) → GB/T AC Port (Chinese EV)
AC Level 2 Only · 50A Max · Three Phase L1+L2+L3 · 22kW Max · IP54 · Right Angle
💡 Why 50A and 22kW? Here’s the difference:
50A is the adapter’s hardware current rating — the maximum current it can safely carry per phase.
22kW is the typical maximum power for most Chinese EVs with 3-phase onboard chargers (e.g. 32A × 3 phases × 230V ≈ 22kW).
The 50A rating future-proofs the adapter for higher-capacity vehicles. Your actual charging speed is always limited by your vehicle’s onboard charger — not the adapter.
✅ Full 22kW — Vehicles with 3-Phase Onboard Charger:
BYD Han EV · BYD Tang EV · NIO ET7 · NIO ET5 · NIO ES8 · Zeekr 001 · Zeekr X
⚠️ Single Phase Speed Only — Vehicles with 1-Phase Onboard Charger: BYD Atto 3 · BYD Seal · Xpeng G9 · MG4 · Other single-phase GB/T vehicles. These vehicles will charge at up to 7.4kW regardless of adapter capability.
⚠️ AC Level 2 Only: This adapter supports AC Level 2 charging only. It is NOT compatible with DC fast charging infrastructure. Use only at Type 2 AC charging stations. Do not use at CCS2 DC fast chargers.
| SKU | CPCADA0025 |
| Connector (Input) | Type 2 / IEC 62196-2 — European Charging Standard |
| Connector (Output) | GB/T 20234.2 (AC) — Chinese EV Standard |
| Rated Current | 50A Max (per phase) |
| Operating Voltage | AC 380V – 450V (Three Phase) |
| Phase Type | Three Phase (L1 + L2 + L3) |
| Max Power Output | 22kW (32A × 3-phase) · Up to 34.5kW at 50A |
| IP Rating | IP54 |
| Housing Material | PC + PA66 + GF25% (Flame Retardant) |
| Pin Material | Silver-Plated Copper |
| Mechanical Life | >10,000 Cycles |
| Operating Temperature | -30°C to +50°C · Humidity 5~95% · Altitude ≤2000m |
| Charging Mode | AC Level 2 Only (Three Phase) |
| HS Code | 8544.42.90 |
Designed for Chinese-market GB/T AC EVs imported to or operating in Europe. Ideal for BYD, NIO, and Zeekr owners who want to access Europe's extensive Type 2 charging network.
| Make | Model | Year | Max AC Speed |
|---|---|---|---|
| BYD | Han EV / Tang EV | 2020–2024 | 11kW (3-phase) |
| BYD | Atto 3 / Seal / Dolphin | 2021–2024 | 7.4kW (single phase) |
| NIO | ET7 / ET5 / ES8 / ES6 | 2019–2024 | 11kW (3-phase) |
| Zeekr | 001 / X / 009 | 2021–2024 | 22kW (3-phase) |
| Xpeng | G9 / P7 / G6 | 2020–2024 | 7.4kW (single phase) |
⚠️ Actual charging speed is limited by the vehicle's onboard charger. Verify your vehicle supports 3-phase AC input before expecting 22kW speeds.
Connector standards compliance: Type 2 / IEC 62196-2 input · GB/T 20234.2 (AC) output · IP54 weather protection rating.
For certification documentation requests, please contact ChargePapa support with your SKU (CPCADA0025).
Q: Why does the adapter say 50A if the max power is 22kW?
A: 50A is the adapter's hardware current rating per phase. 22kW is the typical maximum power for most Chinese EVs with 3-phase onboard chargers (32A × 3 phases × 230V ≈ 22kW). The 50A rating future-proofs the adapter for higher-capacity vehicles. Your actual charging speed is always limited by your vehicle's onboard charger.
Q: Can I charge my BYD Han EV at a 22kW Type 2 station in Europe?
A: Yes, but the BYD Han EV supports up to 11kW (3-phase), so you will charge at 11kW maximum. The adapter supports higher currents to accommodate vehicles like Zeekr 001 which can use the full 22kW.
Q: My BYD Atto 3 only has a single-phase charger. Will this adapter work?
A: Yes, but the BYD Atto 3 will only use one phase (L1) and charge at up to 7.4kW. The three-phase capability will not be utilized.
Q: Is this compatible with DC fast charging stations in Europe?
A: No. This adapter supports AC Level 2 charging only. Do not use at CCS2 DC fast charging stations.
Q: What is the SKU and does ChargePapa ship to Europe?
A: The SKU is CPCADA0025. ChargePapa ships to 50+ countries worldwide including all European countries. Tracked shipping available for all orders.
⚠️ Critical Usage Note: For AC Level 2 charging only. Do NOT use at CCS2 DC fast charging stations. For GB/T AC-port vehicles only. Actual charging speed is limited by your vehicle's onboard charger. Three-phase speed requires a 3-phase onboard charger. Keep connector dry and inspect for damage before each use. Mechanical life rated at >10,000 insertion cycles.
Warranty & Assurance
Warranty & Assurance
2-Year Comprehensive Warranty.
We cover all internal component failures. If a fault occurs, we provide remote diagnosis and free replacement units or parts. No return shipping required for confirmed defects.
Shipping & Lead Time
Shipping & Lead Time
Factory Direct Shipping.
• Processing (QC): 3-5 Business Days
• Global Transit: 8-20 Business Days
• Tracking provided via email upon dispatch.
Global Shipping & Fulfillment
Shipped Direct: Estimated timelines vary by product type.
Total turnaround may vary because product categories have different warehouse stock levels, quality-control procedures, and dispatch preparation cycles before shipment.
Adapters & Accessories
12-22 Business Days
Handling 4-7 business days + transit 8-15 business days.
Portable, Home & DC Chargers
15-29 Business Days
Handling 7-14 business days + transit 8-15 business days.
🏭 The Direct Process
To ensure safety and performance, ChargePapa products go through inspection, preparation, and dispatch coordination before shipment. Different product types may require different warehouse allocation and quality-control turnaround before release.
PART 1 Estimated Handling Time Before Dispatch
Tier 1
Adapters & Accessories
4-7 Business Days
For charging adapters, connector accessories, and related small parts. This handling window remains unchanged.
Tier 2
Portable Chargers, Home Chargers & DC Chargers
7-14 Business Days
For portable EV chargers, home charging stations, and DC charger models including DC SVC-TG and DC EVC-ZG. Additional preparation time is required before dispatch.
PART 2 Transit Time (8-15 Days)
Global Transport
8-15 Days
International transport via Air Freight, Sea Freight, or Land depending on destination and local delivery conditions.
Estimated Timeline by Product Type
Longer total timelines do not mean inactive processing. They reflect differences in stock allocation, warehouse readiness, product inspection workload, and dispatch turnover by category.
| Product Type | Handling Time | Transit Time | Estimated Total |
|---|---|---|---|
| Adapters & Accessories | 4-7 business days | 8-15 business days | 12-22 business days |
| Portable EV Chargers | 7-14 business days | 8-15 business days | 15-29 business days |
| Home Charging Stations | 7-14 business days | 8-15 business days | 15-29 business days |
| DC Chargers / DC SVC-TG / DC EVC-ZG | 7-14 business days | 8-15 business days | 15-29 business days |
Remote Areas & Extended Delivery
Deliveries to remote regions, island destinations, low-frequency carrier zones, or special-route areas may require additional transit time beyond the standard estimate.
Depending on destination access and local logistics availability, shipments may be routed through a combination of air freight, sea freight, and land transport to complete final delivery safely and efficiently.
Logistics & Protection
All international orders are automatically insured against loss or damage. We handle claims with transport partners at no extra cost to you.
We utilize a combination of Air, Sea, and Land transport networks to ensure secure delivery to your specific address.
Tracking numbers are generated after handling is complete. Adapters and accessories usually receive tracking within 4-7 business days, while portable chargers, home charging stations, and DC charger orders may require 7-14 business days before tracking becomes active.
We handle export paperwork. However, specific local import duties or taxes are the recipient's responsibility.
* Product-specific handling times apply before transit begins.
* Orders placed on weekends or holidays will be processed on the next business day.
* Remote regions, islands, and special-route destinations may require additional transit time.
* During high-volume periods such as Black Friday or New Year, handling and transit may require additional time.
* Neither party shall be liable for delays resulting from force majeure events, including natural disasters, strikes, customs holds, or transport disruption.
Need a status check on your order timeline?
Contact our logistics team if your tracking update is taking longer than the estimated handling window for your product type.
✉ info@chargepapa.com
Will this fit my car?
Will this fit my car?
Please verify your car's port type (Type 1 vs Type 2) before purchasing. If unsure, send a photo of your charging port to our chat support.
