ChargePapa Tesla-Link | GB/T to Tesla (NACS) DC Fast Charging Adapter (400A / 1000V)
Couldn't load pickup availability
Every GB/T Station on China's Network.
Now Yours.
You pull up to a GB/T DC fast charger. Your Tesla has a NACS port. Without this adapter, you drive away. With it, you plug in, lock the connector, and charge at full speed — up to 400A, 1000V DC. No app workarounds. No hunting for a compatible station. Just charge.
Verify station compatibility in the Tesla app or your vehicle manufacturer's app before use. Physical connector fit is one requirement — session authorization is separate.

What This Means for You
Pull up to any GB/T DC station →
Your Tesla charges at full speed. No adapter hunting, no range anxiety.
Charging in a rainstorm or a desert summer →
IP65 keeps water and dust out. Works from -30°C to +50°C without complaint.
Worried about the connector falling out mid-session →
Dual locking clasps lock it in place. Walk away. It stays.
Tossing it in the boot between trips →
Compact, carry-handle design. Fits in a glove box bag. Ready when you are.
🔄 How It Works

GB/T DC
China Standard
NACS (SAE J3400)
Tesla Port
Compatibility
Driving a Tesla Model 3 on a long-distance run through China? Here's what to expect at GB/T DC stations along the way.
| Make | Model | Year | Port Type |
|---|---|---|---|
| Tesla | Model 3 | 2017+ | NACS (SAE J3400) |
| Tesla | Model Y | 2020+ | NACS (SAE J3400) |
| Tesla | Model S | 2012+ | NACS (SAE J3400) |
| Tesla | Model X | 2015+ | NACS (SAE J3400) |
⚠️ Verify station compatibility in the Tesla app before use. Session authorization depends on the vehicle, station, and payment flow — not just physical connector fit.
✅ Standards & Certifications
- CE — Conformité Européenne: meets EU safety, health, and environmental requirements.
- RoHS Compliant — Free from restricted hazardous substances including lead, mercury, and cadmium.
- IP65 — Fully dust-tight. Protected against water jets from any direction.
⚠️ Critical Usage Note
Physical connector fit is only one requirement for a successful charging session. Session authorization depends on the vehicle, station, app, and payment flow all being supported. Verify station compatibility in the Tesla app and/or your vehicle manufacturer's app before use. This adapter is for DC fast charging only — not compatible with AC Level 2 stations.
🎯 Which Tesla-Link Is Right for You?
One connector standard. Two current ratings. Here's how to choose.
Step 1 — Confirm Your Vehicle Port
NACS (SAE J3400)
Tesla Model 3, Y, S, X — all years. The narrow oval port on the driver's side rear quarter panel.
CCS2 / CHAdeMO
Non-Tesla EVs with CCS2 or CHAdeMO ports. This adapter is not compatible — see our GB/T to CCS2 range.
Step 2 — Match Your Charging Scenario
City Fast Charger
Standard public DC stations, 60–150 kW output
Recommended: 300A
SKU: MRS-GBT-NACS-DC-300
High-Power DC Hub
Premium stations, 200–400 kW, highway corridors
Recommended: 400A ✓
SKU: MRS-GBT-NACS-DC
Road Trip / Unknown
Mixed stations, want maximum flexibility
Recommended: 400A
SKU: MRS-GBT-NACS-DC
How to check your station's output: Look for the kW rating on the station display or charger unit. Under 150 kW → 300A is sufficient. 150 kW and above → choose 400A for headroom. When in doubt, the 400A handles both scenarios — the station simply won't push more current than it's rated for.
Full Specs — For the Detail-Oriented
| Max Current | 400A (300A variant available) |
| Rated Voltage | 1000V DC |
| Conductor | Silver-Plated Copper |
| Working Temperature | -30°C to +50°C |
| Humidity | 5–95% |
| Altitude | ≤ 2000m |
| IP Rating | IP65 |
| Design | Plug-and-Play, Dual Locking Clasp |
| Certifications | CE, RoHS |
Questions Worth Asking
The ChargePapa Tesla-Link handles the physical connection between GB/T DC stations and your Tesla's NACS (SAE J3400) port. Whether a session authorizes depends on the station, your vehicle software, and the payment flow — not just the adapter. Check the Tesla app before plugging in at an unfamiliar station.
Same GB/T to NACS (SAE J3400) conversion path, same 1000V DC voltage rating. The 400A version handles higher peak current for stations capable of delivering greater power — compared to the 300A version which suits standard high-power DC fast chargers. Both use silver-plated copper conductors.
Yes. The dual locking clasps keep the connection secure throughout the session. The IP65 rating and -30°C to +50°C operating range mean weather won't interrupt it either.
CE (Conformité Européenne) and RoHS compliant — confirming it meets EU safety requirements and is free from restricted hazardous substances including lead, mercury, and cadmium.
IP65 rated — fully dust-tight and protected against water jets from any direction. Operates reliably from -30°C winter cold to +50°C desert heat.
Yes. The Tesla-Link is a DC fast charging adapter only. It is not compatible with AC Level 2 stations.
Warranty & Assurance
Warranty & Assurance
2-Year Comprehensive Warranty.
We cover all internal component failures. If a fault occurs, we provide remote diagnosis and free replacement units or parts. No return shipping required for confirmed defects.
Shipping & Lead Time
Shipping & Lead Time
Factory Direct Shipping.
• Processing (QC): 3-5 Business Days
• Global Transit: 8-20 Business Days
• Tracking provided via email upon dispatch.
Global Shipping & Fulfillment
Shipped Direct: Estimated timelines vary by product type.
Total turnaround may vary because product categories have different warehouse stock levels, quality-control procedures, and dispatch preparation cycles before shipment.
Adapters & Accessories
12-22 Business Days
Handling 4-7 business days + transit 8-15 business days.
Portable, Home & DC Chargers
15-29 Business Days
Handling 7-14 business days + transit 8-15 business days.
🏭 The Direct Process
To ensure safety and performance, ChargePapa products go through inspection, preparation, and dispatch coordination before shipment. Different product types may require different warehouse allocation and quality-control turnaround before release.
PART 1 Estimated Handling Time Before Dispatch
Tier 1
Adapters & Accessories
4-7 Business Days
For charging adapters, connector accessories, and related small parts. This handling window remains unchanged.
Tier 2
Portable Chargers, Home Chargers & DC Chargers
7-14 Business Days
For portable EV chargers, home charging stations, and DC charger models including DC SVC-TG and DC EVC-ZG. Additional preparation time is required before dispatch.
PART 2 Transit Time (8-15 Days)
Global Transport
8-15 Days
International transport via Air Freight, Sea Freight, or Land depending on destination and local delivery conditions.
Estimated Timeline by Product Type
Longer total timelines do not mean inactive processing. They reflect differences in stock allocation, warehouse readiness, product inspection workload, and dispatch turnover by category.
| Product Type | Handling Time | Transit Time | Estimated Total |
|---|---|---|---|
| Adapters & Accessories | 4-7 business days | 8-15 business days | 12-22 business days |
| Portable EV Chargers | 7-14 business days | 8-15 business days | 15-29 business days |
| Home Charging Stations | 7-14 business days | 8-15 business days | 15-29 business days |
| DC Chargers / DC SVC-TG / DC EVC-ZG | 7-14 business days | 8-15 business days | 15-29 business days |
Remote Areas & Extended Delivery
Deliveries to remote regions, island destinations, low-frequency carrier zones, or special-route areas may require additional transit time beyond the standard estimate.
Depending on destination access and local logistics availability, shipments may be routed through a combination of air freight, sea freight, and land transport to complete final delivery safely and efficiently.
Logistics & Protection
All international orders are automatically insured against loss or damage. We handle claims with transport partners at no extra cost to you.
We utilize a combination of Air, Sea, and Land transport networks to ensure secure delivery to your specific address.
Tracking numbers are generated after handling is complete. Adapters and accessories usually receive tracking within 4-7 business days, while portable chargers, home charging stations, and DC charger orders may require 7-14 business days before tracking becomes active.
We handle export paperwork. However, specific local import duties or taxes are the recipient's responsibility.
* Product-specific handling times apply before transit begins.
* Orders placed on weekends or holidays will be processed on the next business day.
* Remote regions, islands, and special-route destinations may require additional transit time.
* During high-volume periods such as Black Friday or New Year, handling and transit may require additional time.
* Neither party shall be liable for delays resulting from force majeure events, including natural disasters, strikes, customs holds, or transport disruption.
Need a status check on your order timeline?
Contact our logistics team if your tracking update is taking longer than the estimated handling window for your product type.
✉ info@chargepapa.com
Installation Guide
Installation Guide
