Skip to product information
1 of 4

ChargePapa Power-Bridge | GB/T to Type 2 Single-Phase Adapter (32A / AC 110V~250V)

On sale Save $29.00 USD (20% off)
Regular price $114.55 USD
Regular price $143.55 USD Sale price $114.55 USD
Sale Sold out
Shipping calculated at checkout.
Quantity
🛡️ Quality Assurance: Every unit undergoes a rigorous 72-hour high-voltage stress test and thermal calibration before dispatch from our global hub. Safety is our priority; quality is non-negotiable.
✅ CE/TUV Safety Certified
🛡️ 2-Year Replacement Warranty
📦 Free Global Shipping

Power-Bridge | GB/T (GB/T 20234.2) → Type 2 (IEC 62196-2) Single-Phase Adapter


The ChargePapa Power-Bridge CP-KL-ADP-027 enables GB/T 20234.2 electric vehicles to charge at IEC 62196-2 Type 2 single-phase AC stations — widely deployed across Europe, Australia, and other regions. Rated at 32A MAX across an AC 110V~250V single-phase range, this adapter delivers approximately 3.5 kW at 110V and up to 8.0 kW at 250V, making it the ideal everyday charging companion for GB/T vehicles travelling internationally. Built with silver-plated copper alloy conductors and a rugged PC+PA66 housing, it is rated for over 10,000 charge cycles in all weather conditions.

GB/T to Type 2 Single-Phase Adapter (32A / AC 110V~250V)

🎯 Which Power-Bridge Setup Is Right for You?

Step 1 · Confirm your connector match

✅ Vehicle side: GB/T (20234.2)

GB/T-standard EVs — BYD, NIO, XPENG, Li Auto, Geely and other Chinese-market cars.

✅ Station side: Type 2 (IEC 62196-2)

Single-phase Type 2 AC posts & wallboxes — the standard across Europe, UK & AU.

If your car is GB/T and the station is single-phase Type 2, the Power-Bridge (SKU CP-KL-ADP-027) is the right adapter for you. Charging at a three-phase Type 2 station? See the CP-KL-ADP-026 Three-Phase model instead.

Step 2 · Match your power & charging scenario

🏠 Home outlet / low-voltage grid
Single-phase AC 110–120V supply, everyday overnight charging.
~3.5 kW
32A @ 110V · CP-KL-ADP-027
🔌 Home wallbox / public AC post
Single-phase AC 230V supply, the most common Level 2 scenario.
~7.4 kW
32A @ 230V · CP-KL-ADP-027
High-current single-phase wallbox
Single-phase AC up to 250V, fastest AC charging this adapter supports.
up to ~8.0 kW
32A @ 250V · CP-KL-ADP-027

Not sure which applies to you? Check your electrician’s label or charger spec sheet for the supply voltage. Household outlets are typically 110–120V (North America) or 220–250V (Europe/UK/AU). This adapter is single-phase, AC only — it will not increase output beyond what your vehicle’s onboard charger and the station can deliver.

ℹ️ Single-Phase AC Charging — AC 110V~250V

This adapter is designed for single-phase AC charging stations (110V~250V). For three-phase AC 380V charging, please refer to the ChargePapa Power-Bridge CP-KL-ADP-026 (GB/T to Type 2 Three-Phase).

GB/T → Type 2 Product Line
Model Current Max Power Phase
Power-Bridge (This) 32A MAX ~3.5–8.0 kW Single-phase
Power-Bridge Three-Phase 32A MAX ~22 kW Three-phase
Omni-Link Pro 50A MAX ~11 kW Single-phase
Engineering Data Sheet
SKU CP-KL-ADP-027
Input Connector IEC 62196-2 Type 2 (Female) — Station Side
Output Connector GB/T 20234.2 (Male) — Vehicle Side
Working Voltage AC 110V~250V (Single-phase)
Rated Current 32A MAX
Max Power Output ~3.5 kW (110V) – ~8.0 kW (250V), single-phase
Phase Type Single-phase
Terminal Temp Rise <50K
Case Material PC + PA66
Conductor Material Copper alloy with silver plating
Insertion Force 45N < F < 100N
Plug/Unplug Life >10,000 cycles
Product Dimensions 166.7 × 70.0 × 69.9 mm
Working Temperature -30°C to +50°C (-22°F to +122°F)
Working Humidity 5% ~ 95% RH
Working Altitude ≤2000m
Compatibility
Station Side (Input) Vehicle Side (Output) Charging Type
IEC 62196-2 Type 2 Single-phase AC Station GB/T 20234.2 EV Port AC Single-phase Only
Compatible with GB/T 20234.2 standard EVs including BYD, NIO, XPENG, Li Auto, Geely, and other Chinese-market EVs. Allows charging at Type 2 single-phase AC stations across Europe, Australia, and other regions.
✅ Standards & Certifications

CE — Conformité Européenne: Meets EU safety, health, and environmental protection requirements.

FCC — Federal Communications Commission: Compliant with electromagnetic interference standards.

Frequently Asked Questions

Q: Which vehicles are compatible with the CP-KL-ADP-027?

A: Compatible with all GB/T 20234.2 standard EVs including BYD, NIO, XPENG, Li Auto, Geely, and other Chinese-market electric vehicles. Allows these vehicles to charge at IEC 62196-2 Type 2 single-phase AC stations across Europe, Australia, and other regions.

Q: What is the difference between this and the CP-KL-ADP-026 Three-Phase adapter?

A: The CP-KL-ADP-027 is for single-phase AC stations (110V~250V, ~3.5–8.0 kW), while the CP-KL-ADP-026 is for three-phase AC 380V stations (~22 kW). Choose based on the type of charging station available at your location.

Q: What is the maximum charging speed?

A: Up to 32A MAX across single-phase AC 110V~250V, delivering approximately 3.5 kW at 110V and up to 8.0 kW at 250V. Actual charging speed depends on your vehicle’s onboard charger capacity and the station’s output rating.

Q: Can I use this adapter at three-phase Type 2 stations?

A: This adapter is optimised for single-phase AC 110V~250V. For three-phase AC 380V charging, please use the ChargePapa CP-KL-ADP-026 Three-Phase adapter.

⚠️ Critical Usage Note

This adapter is designed for single-phase AC charging only (110V~250V). Do not use with DC fast chargers.

Always verify that your charging station output does not exceed 32A / 250V before use.

Warranty & Assurance

2-Year Comprehensive Warranty.
We cover all internal component failures. If a fault occurs, we provide remote diagnosis and free replacement units or parts. No return shipping required for confirmed defects.

Shipping & Lead Time

Factory Direct Shipping.
• Processing (QC): 3-5 Business Days
• Global Transit: 8-20 Business Days
• Tracking provided via email upon dispatch.

Global Shipping & Fulfillment

Shipped Direct: Estimated timelines vary by product type.

Total turnaround may vary because product categories have different warehouse stock levels, quality-control procedures, and dispatch preparation cycles before shipment.

Adapters & Accessories

12-22 Business Days

Handling 4-7 business days + transit 8-15 business days.

Portable, Home & DC Chargers

15-29 Business Days

Handling 7-14 business days + transit 8-15 business days.

🏭 The Direct Process

To ensure safety and performance, ChargePapa products go through inspection, preparation, and dispatch coordination before shipment. Different product types may require different warehouse allocation and quality-control turnaround before release.

PART 1 Estimated Handling Time Before Dispatch

Tier 1

Adapters & Accessories

4-7 Business Days

For charging adapters, connector accessories, and related small parts. This handling window remains unchanged.

Tier 2

Portable Chargers, Home Chargers & DC Chargers

7-14 Business Days

For portable EV chargers, home charging stations, and DC charger models including DC SVC-TG and DC EVC-ZG. Additional preparation time is required before dispatch.

PART 2 Transit Time (8-15 Days)

Global Transport

8-15 Days

International transport via Air Freight, Sea Freight, or Land depending on destination and local delivery conditions.

Estimated Timeline by Product Type

Longer total timelines do not mean inactive processing. They reflect differences in stock allocation, warehouse readiness, product inspection workload, and dispatch turnover by category.

Product Type Handling Time Transit Time Estimated Total
Adapters & Accessories 4-7 business days 8-15 business days 12-22 business days
Portable EV Chargers 7-14 business days 8-15 business days 15-29 business days
Home Charging Stations 7-14 business days 8-15 business days 15-29 business days
DC Chargers / DC SVC-TG / DC EVC-ZG 7-14 business days 8-15 business days 15-29 business days

Remote Areas & Extended Delivery

Deliveries to remote regions, island destinations, low-frequency carrier zones, or special-route areas may require additional transit time beyond the standard estimate.

Depending on destination access and local logistics availability, shipments may be routed through a combination of air freight, sea freight, and land transport to complete final delivery safely and efficiently.

Logistics & Protection

Global Shipping Protection (Included)

All international orders are automatically insured against loss or damage. We handle claims with transport partners at no extra cost to you.

Multi-Modal Transport

We utilize a combination of Air, Sea, and Land transport networks to ensure secure delivery to your specific address.

Tracking Information

Tracking numbers are generated after handling is complete. Adapters and accessories usually receive tracking within 4-7 business days, while portable chargers, home charging stations, and DC charger orders may require 7-14 business days before tracking becomes active.

Customs & Duties

We handle export paperwork. However, specific local import duties or taxes are the recipient's responsibility.

* Product-specific handling times apply before transit begins.

* Orders placed on weekends or holidays will be processed on the next business day.

* Remote regions, islands, and special-route destinations may require additional transit time.

* During high-volume periods such as Black Friday or New Year, handling and transit may require additional time.

* Neither party shall be liable for delays resulting from force majeure events, including natural disasters, strikes, customs holds, or transport disruption.

Need a status check on your order timeline?

Contact our logistics team if your tracking update is taking longer than the estimated handling window for your product type.

✉ info@chargepapa.com

Will this fit my car?

Please verify your car's port type (Type 1 vs Type 2) before purchasing. If unsure, send a photo of your charging port to our chat support.

View full details