ChargePapa Power-Bridge | GB/T to Type 2 Three-Phase Adapter (32A / AC 380V)
Couldn't load pickup availability
Power-Bridge | GB/T (GB/T 20234.2) → Type 2 (IEC 62196-2) Three-Phase Adapter
The ChargePapa Power-Bridge CP-KL-ADP-026 enables GB/T 20234.2 electric vehicles to charge at IEC 62196-2 Type 2 three-phase AC stations — the dominant EV charging standard across Europe. Rated at 32A MAX on AC 380V three-phase power, this adapter delivers up to 22 kW of charging capacity, making it ideal for GB/T vehicles travelling or relocating to European markets. Built with silver-plated copper alloy conductors and a rugged PC+PA66 housing, it is rated for over 10,000 charge cycles in all weather conditions.

This adapter is designed for three-phase AC 380V charging stations only. It is not compatible with single-phase stations. Verify your charging station supports three-phase AC 380V output before use.
| Model | Current | Max Power | Phase |
|---|---|---|---|
| Power-Bridge (This) | 32A MAX | ~22 kW | Three-phase |
| Omni-Link Pro | 50A MAX | ~22 kW+ | Three-phase |
| SKU | CP-KL-ADP-026 |
| Input Connector | IEC 62196-2 Type 2 (Female) — Station Side |
| Output Connector | GB/T 20234.2 (Male) — Vehicle Side |
| Working Voltage | AC 380V (Three-phase) |
| Rated Current | 32A MAX |
| Max Power Output | ~22 kW (Three-phase @ 380V) |
| Phase Type | Three-phase |
| Terminal Temp Rise | <50K |
| Case Material | PC + PA66 |
| Conductor Material | Copper alloy with silver plating |
| Insertion Force | 45N < F < 100N |
| Plug/Unplug Life | >10,000 cycles |
| Product Dimensions | 166.7 × 70.0 × 69.9 mm |
| Working Temperature | -30°C to +50°C (-22°F to +122°F) |
| Working Humidity | 5% ~ 95% RH |
| Working Altitude | ≤2000m |
| Station Side (Input) | Vehicle Side (Output) | Charging Type |
|---|---|---|
| IEC 62196-2 Type 2 Three-phase AC Station | GB/T 20234.2 EV Port | AC Three-phase Only |
| Compatible with GB/T 20234.2 standard EVs including BYD, NIO, XPENG, Li Auto, and other Chinese-market EVs charging at European Type 2 three-phase AC stations. | ||
CE — Conformité Européenne: Meets EU safety, health, and environmental protection requirements.
FCC — Federal Communications Commission: Compliant with electromagnetic interference standards.
Q: Which vehicles are compatible with the CP-KL-ADP-026?
A: Compatible with all GB/T 20234.2 standard EVs including BYD, NIO, XPENG, Li Auto, Geely, and other Chinese-market electric vehicles. Allows these vehicles to charge at IEC 62196-2 Type 2 three-phase AC stations widely deployed across Europe.
Q: What is the maximum charging speed?
A: Up to 32A MAX on three-phase AC 380V, delivering approximately 22 kW. Actual charging speed depends on your vehicle’s onboard charger capacity and the station’s output rating.
Q: How does this differ from the Omni-Link GB/T to Type 2 Pro?
A: The Power-Bridge CP-KL-ADP-026 is rated at 32A MAX (standard grade), while the Omni-Link Pro supports up to 50A MAX for higher-capacity charging. Both are three-phase adapters; choose based on your vehicle’s onboard charger rating.
Q: Can I use this adapter at single-phase Type 2 stations?
A: No. The CP-KL-ADP-026 is designed for three-phase AC 380V stations only. For single-phase Type 2 charging, please refer to ChargePapa’s single-phase GB/T to Type 2 adapter series.
This adapter is designed for three-phase AC 380V charging only. Do not use with single-phase stations or DC fast chargers.
Always verify that your charging station supports three-phase AC 380V output and does not exceed 32A before use.
Warranty & Assurance
Warranty & Assurance
2-Year Comprehensive Warranty.
We cover all internal component failures. If a fault occurs, we provide remote diagnosis and free replacement units or parts. No return shipping required for confirmed defects.
Shipping & Lead Time
Shipping & Lead Time
Factory Direct Shipping.
• Processing (QC): 3-5 Business Days
• Global Transit: 8-20 Business Days
• Tracking provided via email upon dispatch.
Global Shipping & Fulfillment
Shipped Direct: Estimated timelines vary by product type.
Total turnaround may vary because product categories have different warehouse stock levels, quality-control procedures, and dispatch preparation cycles before shipment.
Adapters & Accessories
12-22 Business Days
Handling 4-7 business days + transit 8-15 business days.
Portable, Home & DC Chargers
15-29 Business Days
Handling 7-14 business days + transit 8-15 business days.
🏭 The Direct Process
To ensure safety and performance, ChargePapa products go through inspection, preparation, and dispatch coordination before shipment. Different product types may require different warehouse allocation and quality-control turnaround before release.
PART 1 Estimated Handling Time Before Dispatch
Tier 1
Adapters & Accessories
4-7 Business Days
For charging adapters, connector accessories, and related small parts. This handling window remains unchanged.
Tier 2
Portable Chargers, Home Chargers & DC Chargers
7-14 Business Days
For portable EV chargers, home charging stations, and DC charger models including DC SVC-TG and DC EVC-ZG. Additional preparation time is required before dispatch.
PART 2 Transit Time (8-15 Days)
Global Transport
8-15 Days
International transport via Air Freight, Sea Freight, or Land depending on destination and local delivery conditions.
Estimated Timeline by Product Type
Longer total timelines do not mean inactive processing. They reflect differences in stock allocation, warehouse readiness, product inspection workload, and dispatch turnover by category.
| Product Type | Handling Time | Transit Time | Estimated Total |
|---|---|---|---|
| Adapters & Accessories | 4-7 business days | 8-15 business days | 12-22 business days |
| Portable EV Chargers | 7-14 business days | 8-15 business days | 15-29 business days |
| Home Charging Stations | 7-14 business days | 8-15 business days | 15-29 business days |
| DC Chargers / DC SVC-TG / DC EVC-ZG | 7-14 business days | 8-15 business days | 15-29 business days |
Remote Areas & Extended Delivery
Deliveries to remote regions, island destinations, low-frequency carrier zones, or special-route areas may require additional transit time beyond the standard estimate.
Depending on destination access and local logistics availability, shipments may be routed through a combination of air freight, sea freight, and land transport to complete final delivery safely and efficiently.
Logistics & Protection
All international orders are automatically insured against loss or damage. We handle claims with transport partners at no extra cost to you.
We utilize a combination of Air, Sea, and Land transport networks to ensure secure delivery to your specific address.
Tracking numbers are generated after handling is complete. Adapters and accessories usually receive tracking within 4-7 business days, while portable chargers, home charging stations, and DC charger orders may require 7-14 business days before tracking becomes active.
We handle export paperwork. However, specific local import duties or taxes are the recipient's responsibility.
* Product-specific handling times apply before transit begins.
* Orders placed on weekends or holidays will be processed on the next business day.
* Remote regions, islands, and special-route destinations may require additional transit time.
* During high-volume periods such as Black Friday or New Year, handling and transit may require additional time.
* Neither party shall be liable for delays resulting from force majeure events, including natural disasters, strikes, customs holds, or transport disruption.
Need a status check on your order timeline?
Contact our logistics team if your tracking update is taking longer than the estimated handling window for your product type.
✉ info@chargepapa.com
Will this fit my car?
Will this fit my car?
Please verify your car's port type (Type 1 vs Type 2) before purchasing. If unsure, send a photo of your charging port to our chat support.
