Skip to product information
1 of 1

ChargePapa Omni-Link | GB/T to Type 2 Adapter (3-Phase 22kW / 50A Max)

ChargePapa Omni-Link | GB/T to Type 2 Adapter (3-Phase 22kW / 50A Max)

Regular price $139.00 USD
Regular price Sale price $139.00 USD
Sale Sold out
Shipping calculated at checkout.
Quantity
🛡️ Quality Assurance: Every unit undergoes a rigorous 72-hour high-voltage stress test and thermal calibration before dispatch from our global hub. Safety is our priority; quality is non-negotiable.
✅ CE/TUV Safety Certified
🛡️ 2-Year Replacement Warranty
📦 Free Global Shipping

Maximum AC Speed.
3-Phase 22kW Bridge.

Unlock the full charging potential of your imported European EV (Type 2) on Chinese GB/T networks. The ChargePapa Omni-Link (3-Phase) utilizes all three power lines (L1+L2+L3) to deliver up to 22kW (32A 3-Phase) or 11kW (16A 3-Phase). Perfect for high-performance EVs like the Audi e-tron, Renault Zoe, or Tesla Model S/X (EU Spec).

🔌 3-Phase Power Flow

Input (Charger)

GB/T 3-Phase Station

Output (Vehicle)

EU Type 2 Port

Engineering Data Sheet
Rated Current 50A Max
Operating Voltage 380V - 450V AC
Phase Type Three Phase (L1+L2+L3)
Max Power 22kW (at 32A)
Housing Material PC + PA66 + GF25%
Mechanical Life >10,000 Cycles
💡 Backward Compatibility

Universal Fit: This 3-Phase adapter also works perfectly with Single-Phase Type 2 cars (e.g., older VW e-Golf, Nissan Leaf with Type 2). It will automatically simply use one phase (L1) at up to 7kW.

Warranty & Assurance

2-Year Comprehensive Warranty.
We cover all internal component failures. If a fault occurs, we provide remote diagnosis and free replacement units or parts. No return shipping required for confirmed defects.

Shipping & Lead Time

Factory Direct Shipping.
• Processing (QC): 3-5 Business Days
• Global Transit: 8-15 Business Days
• Tracking provided via email upon dispatch.

Global Shipping & Fulfillment

Factory Direct Logistics: Estimated Total Turnaround 11-20 Business Days.

🏭 Why the wait? (The Factory Direct Model)

Unlike generic retailers who ship off-the-shelf units, every ChargePapa station undergoes a final load-testing sequence before dispatch. By shipping directly from our manufacturing hub, we ensure you receive a freshly calibrated unit at wholesale pricing.

Fulfillment Timeline

PHASE 1

Processing & QC

3-5 Days

Bench testing, Safety Check, Packing.

PHASE 2

Global Transit

8-15 Days

Air Freight / Express Logistics.

TOTAL

Delivery Estimate

11-20 Days

Business Days (Mon-Fri).

Logistics Details

  • Free Shipping: Standard international shipping is included in the price.

* Orders placed on weekends or holidays will be processed the following business day.  During high-volume periods (like Valentine's Day, Black Friday or New Year), processing may extra days.

* Neither party shall be liable for delays or failures in performance resulting from force majeure events, including but not limited to natural disasters, strikes, customs holds, or other logistical disruptions beyond either party’s reasonable control.

  • Tracking: Tracking numbers are generated *after* Phase 1 (Quality Check) is complete. Please allow up to 5 days to receive your code.
  • Customs: We handle most paperwork, but specific local import duties (if any) are the recipient's responsibility.

Tracking update taking longer than 7 days?

✉ info@chargepapa.com

Will this fit my car?

Please verify your car's port type (Type 1 vs Type 2) before purchasing. If unsure, send a photo of your charging port to our chat support.

View full details