ChargePapa MRS-EA2 | 11kW-22kW 3-Phase Portable EV Charger (Stepless Adjustment)
ChargePapa MRS-EA2 | 11kW-22kW 3-Phase Portable EV Charger (Stepless Adjustment)
Couldn't load pickup availability
Commercial Power in Your Trunk.
11kW & 22kW 3-Phase Performance.
The ChargePapa MRS-EA2 Series is our high-capacity mobile solution for EVs with three-phase onboard chargers. Available in 11kW (16A) and 22kW (32A) configurations, it features a technical stepless current adjustment system. Use it as a permanent wallbox with the included bracket, or take it on the road for the fastest portable charging possible.

⚙️ Hardware & Phase Specifications
- Standard: IEC 62196-2 (Type 2) | 3-Phase (Mode 2).
- Output Options: 11kW (16A max) or 22kW (32A max).
- Input Connection: CEE Red 16A (for 11kW) / CEE Red 32A (for 22kW).
- Adjustment Range: 6A to 16A/32A (Stepless).
- Protection Grade: IP65 (Control Box) / IK10 (Impact resistance).
- Cable Length: 5 Meters High-purity Copper.
🛡️ Safety Engineering
- Leakage Protection: Type A RCD (30mA AC).
- Thermal Safety: Built-in sensors monitor PCB and connector temperature.
- Electrical Guard: Over-voltage, Under-voltage, Over-load, and Surge protection.
- Certification: CE & TUV standard compliance.
Warranty & Assurance
Warranty & Assurance
2-Year Comprehensive Warranty.
We cover all internal component failures. If a fault occurs, we provide remote diagnosis and free replacement units or parts. No return shipping required for confirmed defects.
Shipping & Lead Time
Shipping & Lead Time
Factory Direct Shipping.
• Processing (QC): 3-5 Business Days
• Global Transit: 8-15 Business Days
• Tracking provided via email upon dispatch.
Global Shipping & Fulfillment
Factory Direct Logistics: Estimated Total Turnaround 11-20 Business Days.
🏭 Why the wait? (The Factory Direct Model)
Unlike generic retailers who ship off-the-shelf units, every ChargePapa station undergoes a final load-testing sequence before dispatch. By shipping directly from our manufacturing hub, we ensure you receive a freshly calibrated unit at wholesale pricing.
Fulfillment Timeline
Processing & QC
3-5 Days
Bench testing, Safety Check, Packing.
Global Transit
8-15 Days
Air Freight / Express Logistics.
Delivery Estimate
11-20 Days
Business Days (Mon-Fri).
Logistics Details
- Free Shipping: Standard international shipping is included in the price.
* Orders placed on weekends or holidays will be processed the following business day. During high-volume periods (like Valentine's Day, Black Friday or New Year), processing may extra days.
* Neither party shall be liable for delays or failures in performance resulting from force majeure events, including but not limited to natural disasters, strikes, customs holds, or other logistical disruptions beyond either party’s reasonable control.
- Tracking: Tracking numbers are generated *after* Phase 1 (Quality Check) is complete. Please allow up to 5 days to receive your code.
- Customs: We handle most paperwork, but specific local import duties (if any) are the recipient's responsibility.
Tracking update taking longer than 7 days?
✉ info@chargepapa.com
Installation Guide
Installation Guide
22kW changed my overnight routine completely, battery is full by the time I wake up ngl We dropped this into our office parking lot and it just works, so yeah
Solides Kabel, funktioniert perfekt mit meinem Elektroauto. Empfehlenswert!
Muy buen cargador, instalación sencilla y carga rápida. Tienda muy confiable y envío rápido.
