ChargePapa MRS-EA2 | 11kW-22kW 3-Phase Portable EV Charger (Stepless Adjustment)
ChargePapa MRS-EA2 | 11kW-22kW 3-Phase Portable EV Charger (Stepless Adjustment)
Couldn't load pickup availability
Commercial Power in Your Trunk.
11kW & 22kW 3-Phase Performance.
The ChargePapa MRS-EA2 Series is our high-capacity mobile solution for EVs with three-phase onboard chargers. Available in 11kW (16A) and 22kW (32A) configurations, it features a technical stepless current adjustment system. Use it as a permanent wallbox with the included bracket, or take it on the road for the fastest portable charging possible.

⚙️ Hardware & Phase Specifications
- Standard: IEC 62196-2 (Type 2) | 3-Phase (Mode 2).
- Output Options: 11kW (16A max) or 22kW (32A max).
- Input Connection: CEE Red 16A (for 11kW) / CEE Red 32A (for 22kW).
- Adjustment Range: 6A to 16A/32A (Stepless).
- Protection Grade: IP65 (Control Box) / IK10 (Impact resistance).
- Cable Length: 5 Meters High-purity Copper.
🛡️ Safety Engineering
- Leakage Protection: Type A RCD (30mA AC).
- Thermal Safety: Built-in sensors monitor PCB and connector temperature.
- Electrical Guard: Over-voltage, Under-voltage, Over-load, and Surge protection.
- Certification: CE & TUV standard compliance.
Warranty & Assurance
Warranty & Assurance
2-Year Comprehensive Warranty.
We cover all internal component failures. If a fault occurs, we provide remote diagnosis and free replacement units or parts. No return shipping required for confirmed defects.
Shipping & Lead Time
Shipping & Lead Time
Factory Direct Shipping.
• Processing (QC): 3-5 Business Days
• Global Transit: 8-15 Business Days
• Tracking provided via email upon dispatch.
Global Shipping & Fulfillment
Factory Direct Logistics: Estimated Total Turnaround 12-27 Business Days.
🏭 The Factory Direct Process
To ensure safety and performance, every ChargePapa unit undergoes a rigorous load-testing sequence before dispatch. We prioritize quality control over instant shipping.
PART 1 Handling Time (4 - 7 Days)
A. QC & Processing
3-5 Days
Bench testing, high-voltage safety check, and calibration.
B. Packing & Flight Booking
1-2 Days
Reinforced protective packaging and air cargo space reservation.
PART 2 Transit Time (8 - 20 Days)
Global Transport
8-20 Days
International transport via Air Freight, Sea Freight, or Land (depending on region).
Logistics & Protection
All international orders are automatically insured against loss or damage. We handle claims with transport partners—no extra cost to you.
We utilize a combination of Air, Sea, and Land transport networks to ensure secure delivery to your specific address.
Tracking numbers are generated after Part 1 (Handling) is complete. Please allow up to 7 days to receive your active code.
We handle export paperwork. However, specific local import duties or taxes are the recipient's responsibility.
* Orders placed on weekends or holidays will be processed the following business day.
* During high-volume periods (like Black Friday or New Year), handling and transit may take extra days.
* Neither party shall be liable for delays resulting from force majeure events (natural disasters, strikes, customs holds, etc.).
Tracking update taking longer than 7 days?
Contact our logistics team for a status check.
✉ info@chargepapa.com
Installation Guide
Installation Guide
22kW changed my overnight routine completely, battery is full by the time I wake up ngl We dropped this into our office parking lot and it just works, so yeah
Solides Kabel, funktioniert perfekt mit meinem Elektroauto. Empfehlenswert!
Muy buen cargador, instalación sencilla y carga rápida. Tienda muy confiable y envío rápido.
