ChargePapa MRS-EU | 7kW-22kW Smart AC Wallbox (Type 2, WiFi/App/RFID)
ChargePapa MRS-EU | 7kW-22kW Smart AC Wallbox (Type 2, WiFi/App/RFID)
Impossible de charger la disponibilité du service de retrait
Smart Energy Management.
Precision Engineering.
The ChargePapa MRS-EU Series defines the modern home charging experience. Equipped with a brilliant 4.3-inch LCD monitoring screen and fully integrated WiFi/APP connectivity, it provides real-time data transparency and secure access control via RFID. Built to withstand the harshest environments with an IP65 rating.
⚙️ System & Build Specifications
- Enclosure Material: Polycarbonate + ABS (UV Resistant & Flame Retardant).
- Connector Type: Type 2 (IEC 62196-2) with 5m/7m Copper Cable.
- Communication: WiFi (2.4GHz), Bluetooth, and OCPP 1.6J Ready.
- Mounting: Wall-mounted (standard) or Pedestal (optional).
- Operating Temperature: -30°C to +55°C (-22°F to 131°F).
- Control Modes: App, RFID Card, or Plug & Charge.
🛡️ Safety Engineering
Equipped with a comprehensive safety suite:
- Leakage Protection: Type A + DC 6mA (Advanced RCD sensing).
- Grid Safety: Over-current, Over-voltage, Under-voltage, and Frequency protection.
- Grounding: PEN fault protection (specific to UK/EU requirements).
- Internal Security: Real-time PCB temperature monitoring with auto-throttle.
🔌 Installation Brief
Hardwired installation by a licensed electrician is required. The MRS-EU supports both single-phase and three-phase incoming service.
Warranty & Assurance
Warranty & Assurance
2-Year Comprehensive Warranty.
We cover all internal component failures. If a fault occurs, we provide remote diagnosis and free replacement units or parts. No return shipping required for confirmed defects.
Shipping & Lead Time
Shipping & Lead Time
Factory Direct Shipping.
• Processing (QC): 3-5 Business Days
• Global Transit: 8-15 Business Days
• Tracking provided via email upon dispatch.
Global Shipping & Fulfillment
Factory Direct Logistics: Estimated Total Turnaround 11-20 Business Days.
🏭 Why the wait? (The Factory Direct Model)
Unlike generic retailers who ship off-the-shelf units, every ChargePapa station undergoes a final load-testing sequence before dispatch. By shipping directly from our manufacturing hub, we ensure you receive a freshly calibrated unit at wholesale pricing.
Fulfillment Timeline
Processing & QC
3-5 Days
Bench testing, Safety Check, Packing.
Global Transit
8-15 Days
Air Freight / Express Logistics.
Delivery Estimate
11-20 Days
Business Days (Mon-Fri).
Logistics Details
- Free Shipping: Standard international shipping is included in the price.
* Orders placed on weekends or holidays will be processed the following business day. During high-volume periods (like Valentine's Day, Black Friday or New Year), processing may extra days.
* Neither party shall be liable for delays or failures in performance resulting from force majeure events, including but not limited to natural disasters, strikes, customs holds, or other logistical disruptions beyond either party’s reasonable control.
- Tracking: Tracking numbers are generated *after* Phase 1 (Quality Check) is complete. Please allow up to 5 days to receive your code.
- Customs: We handle most paperwork, but specific local import duties (if any) are the recipient's responsibility.
Tracking update taking longer than 7 days?
✉ info@chargepapa.com
Installation Guide
Installation Guide
22kW changed my overnight routine completely, battery is full by the time I wake up
