ChargePapa MRS-AJ8 | TYPE 1 Smart EV Charger (32A/40A/48A Adjustable) WiFi/4G
Couldn't load pickup availability
Always Connected.
32A–48A Smart Power.
The ChargePapa MRS-AJ8 is our most advanced residential and light-commercial Level 2 station, featuring triple connectivity — 4G LTE + WiFi + Bluetooth. Available in 32A, 40A, and 48A (11.5kW) configurations, it gives you full remote control via app while remaining fully OCPP 1.6J compliant for commercial billing integration. Compact, smart, and built to last.


MRS-AJ8 Series — Choose Your Power Level
| Spec | MRS-AJ8-07032 | MRS-AJ8-09040 | MRS-AJ8-11048 |
|---|---|---|---|
| Max Power | 7.6kW | 9.6kW | 11.5kW |
| Rated Current | 32A | 40A | 48A |
| Cable Spec | 10AWG/3C+18AWG | 9AWG/2C+10AWG+18AWG | 8AWGx2C+10AWG+18AWG |
| Circuit Breaker | 40A dedicated | 50A dedicated | 60A dedicated |
| Weight | ~4.0kg | ~4.0kg | ~5.9kg |
| Connectivity | 4G · WiFi · Bluetooth · OCPP 1.6J | ||
| Price | $499.00 | $549.00 | $609.00 |
🚗 Charging Your Tesla with the MRS-AJ8?
The MRS-AJ8 uses a SAE J1772 (Type 1) connector. Tesla vehicles use the NACS (SAE J3400) port. To charge your Tesla at this station, you'll need one of the following ChargePapa adapters:
Engineering Data Sheet
| Parameter | MRS-AJ8-07032 | MRS-AJ8-09040 | MRS-AJ8-11048 |
|---|---|---|---|
| Connector Standard | SAE J1772 (Type 1) | ||
| Max Power Output | 7.6kW | 9.6kW | 11.5kW |
| Rated Current | 32A | 40A | 48A |
| Input Voltage | 85V–265V AC | ||
| Output Voltage | 85V–265V AC | ||
| Frequency | 50Hz / 60Hz | ||
| Phase Type | Single-phase | ||
| Standby Power | 3W | ||
| Cable Length | 5m (16.4ft) — Custom length available | ||
| Cable Spec | 10AWG/3C+18AWG | 9AWG/2C+10AWG+18AWG | 8AWGx2C+10AWG+18AWG |
| Enclosure Material | PC9330 (gun) + PC + ABS (control box) | ||
| Control Box (H×W×D) | 340 × 190 × 80mm | ||
| Weight | ~4.0kg | ~4.0kg | ~5.9kg |
| Mounting | Wall-mount / Pedestal (optional) | ||
| Panel Colors | Gray / White / Black (custom available) | ||
| Cooling Method | Natural convection | ||
| IP Rating | IP54 | ||
| Working Temperature | -30°C to +50°C | ||
| Humidity | 5%–95% (non-condensing) | ||
| Altitude | <2000m | ||
| Flame Retardancy | UL94 V0 | ||
| HMI | 3-color LED indicator + 4.3" LCD display + APP | ||
| Access Control | Plug-in / Bluetooth / RFID card / APP | ||
| Connectivity | 4G · WiFi · Bluetooth · OCPP 1.6J | ||
| Leakage Protection | Type A (AC 30mA) | ||
| Safety Protection | Under/over-voltage · Over-current · Over-load · Over-temp · Leakage · Ground fault · Lightning surge · Flame retardant | ||
| Packaging (L×W×H) | 380×200×210mm (~4.9kg) | 380×200×210mm (~4.9kg) | 380×200×210mm (~6.8kg) |
| Certifications | FCC · UL | ||
Vehicle Compatibility
The MRS-AJ8 is compatible with all SAE J1772 (Type 1) port vehicles — the standard AC charging port across most North American EVs. Its smart app control and OCPP 1.6J connectivity make it equally at home in a private garage in Austin or a managed parking facility in Chicago. Tesla owners can charge using the optional adapter listed above.

| Make | Model | Year | Port Type |
|---|---|---|---|
| Chevrolet | Bolt EV / Bolt EUV | 2017+ | J1772 (SAE J1772) |
| Nissan | LEAF | 2011+ | J1772 (SAE J1772) |
| Ford | Mustang Mach-E | 2021+ | J1772 (SAE J1772) |
| Ford | F-150 Lightning | 2022+ | J1772 (SAE J1772) |
| Rivian | R1T / R1S | 2022+ | J1772 (SAE J1772) |
| Hyundai | IONIQ 5 / IONIQ 6 | 2022+ | J1772 (SAE J1772) |
| Kia | EV6 / EV9 | 2022+ | J1772 (SAE J1772) |
| Volkswagen | ID.4 | 2021+ | J1772 (SAE J1772) |
| BMW | i4 / iX / i7 | 2022+ | J1772 (SAE J1772) |
| Tesla | Model S / 3 / X / Y / Cybertruck | 2012+ | NACS (SAE J3400) — Adapter required |
⚠️ Compatibility data based on manufacturer specifications. Tesla vehicles require the ChargePapa Tesla→J1772 adapter listed above. Applies to North American market vehicles.
🏠 Who Is the MRS-AJ8 Built For?
For the tech-forward homeowner in Seattle, Denver, or San Jose who wants more than just a charger — the MRS-AJ8-07032 (32A) delivers full SAE J1772 Level 2 charging with real-time app monitoring, scheduled off-peak charging, and remote current adjustment. Set it to charge at 2am when electricity rates drop, and wake up to a full battery every morning.
For property managers and HOAs in cities like Los Angeles, Miami, or Atlanta who need to offer EV charging as an amenity without building a full commercial network, the MRS-AJ8's OCPP 1.6J compatibility means it can connect to any third-party billing platform — giving residents metered, paid charging without the complexity of a dedicated charging network contract.
For small business owners in Phoenix, Dallas, or Nashville who want to offer employee or customer EV charging with access control and usage reporting, the MRS-AJ8-11048 (48A, 11.5kW) provides enterprise-grade connectivity — RFID card access, 4G LTE backup, and OCPP fleet integration — in a compact wall-mount form factor that installs in a standard parking space.
✅ Standards & Certifications
Frequently Asked Questions
Q: Does the ChargePapa MRS-AJ8 work without WiFi or a phone signal?
A: Yes. The MRS-AJ8 includes a physical SIM card slot for 4G LTE connectivity as a backup when WiFi is unavailable. It also supports Bluetooth for local app control. In plug-in mode, it charges without any network connection at all.
Q: Can I connect the MRS-AJ8 to a third-party EV charging network for billing?
A: Yes. The ChargePapa MRS-AJ8 supports OCPP 1.6J (JSON), the open industry standard for EV charger network integration. It is compatible with third-party commercial backend platforms for metered billing, access control, and usage reporting. Network integration and backend configuration are managed by your chosen OCPP platform provider.
Q: Is the MRS-AJ8 compatible with Tesla vehicles?
A: The MRS-AJ8 uses a SAE J1772 (Type 1) connector. Tesla vehicles use the NACS (SAE J3400) port. To charge a Tesla Model S, 3, X, or Y at this station, you will need a ChargePapa Tesla-to-J1772 adapter — see the adapter module above. The Omni-Link Ultra (80A) is the highest-current option available for this pairing.
Q: Is the ChargePapa MRS-AJ8 FCC and UL certified?
A: Yes. The MRS-AJ8 has passed FCC (Federal Communications Commission) electromagnetic compliance testing and UL (Underwriters Laboratories) product safety certification for the North American market. The housing also meets UL94 V0 flame retardancy standards.
Q: Can I schedule charging to run during off-peak electricity hours?
A: Yes. The ChargePapa MRS-AJ8 supports scheduled charging via the mobile app. You can set specific start and end times to take advantage of lower overnight electricity rates — a common feature for homeowners in states like California, Texas, or New York where time-of-use pricing applies.
Q: What is the difference between the MRS-AJ8 and the standard MRS-AJ?
A: The ChargePapa MRS-AJ8 adds triple connectivity (4G LTE + WiFi + Bluetooth), mobile app control, scheduled charging, and OCPP 1.6J network integration compared to the standard MRS-AJ. It also features a more compact enclosure (340×190× 80mm vs 315×245×105mm) and is lighter — making it the preferred choice for smart home and light commercial installations where remote management matters.
⚠️ Critical Usage Note
- Professional electrical installation by a licensed electrician is mandatory. Do not self-install.
- Do not connect to a standard household outlet. A dedicated hardwired circuit is required (40A for 32A model / 50A for 40A model / 60A for 48A model).
- Ensure your electrical panel has sufficient capacity before installation.
- Insert a valid SIM card before powering on if using 4G connectivity.
- Inspect cable and connector regularly. Discontinue use if damage or overheating is detected.
- This unit is designed for AC Level 2 charging only. It does not support DC fast charging.
🏢 Using This Charger in a Commercial Network?
The MRS-AJ8 supports OCPP 1.6J and is compatible with third-party EV charging network platforms for metered billing, fleet management, and remote monitoring.
Network integration, backend configuration, and billing services are provided by your chosen OCPP platform — not by ChargePapa. If you need help selecting a compatible network provider or have questions about bulk deployment, feel free to reach out.
*Typical response time: <12 Hours.
Warranty & Assurance
Warranty & Assurance
2-Year Comprehensive Warranty.
We cover all internal component failures. If a fault occurs, we provide remote diagnosis and free replacement units or parts. No return shipping required for confirmed defects.
Shipping & Lead Time
Shipping & Lead Time
Factory Direct Shipping.
• Processing (QC): 3-5 Business Days
• Global Transit: 8-20 Business Days
• Tracking provided via email upon dispatch.
Global Shipping & Fulfillment
Shipped Direct: Estimated timelines vary by product type.
Total turnaround may vary because product categories have different warehouse stock levels, quality-control procedures, and dispatch preparation cycles before shipment.
Adapters & Accessories
12-22 Business Days
Handling 4-7 business days + transit 8-15 business days.
Portable, Home & DC Chargers
15-29 Business Days
Handling 7-14 business days + transit 8-15 business days.
🏭 The Direct Process
To ensure safety and performance, ChargePapa products go through inspection, preparation, and dispatch coordination before shipment. Different product types may require different warehouse allocation and quality-control turnaround before release.
PART 1 Estimated Handling Time Before Dispatch
Tier 1
Adapters & Accessories
4-7 Business Days
For charging adapters, connector accessories, and related small parts. This handling window remains unchanged.
Tier 2
Portable Chargers, Home Chargers & DC Chargers
7-14 Business Days
For portable EV chargers, home charging stations, and DC charger models including DC SVC-TG and DC EVC-ZG. Additional preparation time is required before dispatch.
PART 2 Transit Time (8-15 Days)
Global Transport
8-15 Days
International transport via Air Freight, Sea Freight, or Land depending on destination and local delivery conditions.
Estimated Timeline by Product Type
Longer total timelines do not mean inactive processing. They reflect differences in stock allocation, warehouse readiness, product inspection workload, and dispatch turnover by category.
| Product Type | Handling Time | Transit Time | Estimated Total |
|---|---|---|---|
| Adapters & Accessories | 4-7 business days | 8-15 business days | 12-22 business days |
| Portable EV Chargers | 7-14 business days | 8-15 business days | 15-29 business days |
| Home Charging Stations | 7-14 business days | 8-15 business days | 15-29 business days |
| DC Chargers / DC SVC-TG / DC EVC-ZG | 7-14 business days | 8-15 business days | 15-29 business days |
Remote Areas & Extended Delivery
Deliveries to remote regions, island destinations, low-frequency carrier zones, or special-route areas may require additional transit time beyond the standard estimate.
Depending on destination access and local logistics availability, shipments may be routed through a combination of air freight, sea freight, and land transport to complete final delivery safely and efficiently.
Logistics & Protection
All international orders are automatically insured against loss or damage. We handle claims with transport partners at no extra cost to you.
We utilize a combination of Air, Sea, and Land transport networks to ensure secure delivery to your specific address.
Tracking numbers are generated after handling is complete. Adapters and accessories usually receive tracking within 4-7 business days, while portable chargers, home charging stations, and DC charger orders may require 7-14 business days before tracking becomes active.
We handle export paperwork. However, specific local import duties or taxes are the recipient's responsibility.
* Product-specific handling times apply before transit begins.
* Orders placed on weekends or holidays will be processed on the next business day.
* Remote regions, islands, and special-route destinations may require additional transit time.
* During high-volume periods such as Black Friday or New Year, handling and transit may require additional time.
* Neither party shall be liable for delays resulting from force majeure events, including natural disasters, strikes, customs holds, or transport disruption.
Need a status check on your order timeline?
Contact our logistics team if your tracking update is taking longer than the estimated handling window for your product type.
✉ info@chargepapa.com
Installation Guide
Installation Guide
