ChargePapa MRS-ED | 7kW-22kW Smart Home Wallbox (Type 2)
ChargePapa MRS-ED | 7kW-22kW Smart Home Wallbox (Type 2)
Couldn't load pickup availability
Professional Grade Home Charging.
Engineered for Longevity.
The ChargePapa MRS-ED Series is our most versatile AC station for the European market. Whether you require a standard 7kW single-phase setup or a high-speed 22kW three-phase system, the MRS-ED offers a sleek, IP65-rated solution that balances power delivery with advanced thermal management.
⚙️ Electrical & Material Specs
- Enclosure Material: Industrial-grade PC+ABS (Fire Retardant UL94-V0).
- Cable Specs: 5m/7m standard length (Oxygen-free copper).
- Charging Mode: Level 2 (Mode 3) Plug & Charge / RFID / APP.
- Idle Power: < 3W (Energy Saving).
- Operating Temperature: -30°C to +55°C.
- Cooling: Natural air cooling with optimized heat-sink design.
🛡️ Advanced Protection Protocols
Our active safety system monitors every charge session:
- Leakage Protection: Type A + DC 6mA (No external RCD required in most regions).
- Voltage Safety: Over-voltage, under-voltage, and surge protection (Lightning protection).
- Thermal Safety: Real-time temperature monitoring for both the control board and plug.
- Hardware Security: Physical Emergency Stop button on the side.
🔌 Installation Brief
Universal Mounting: Standard wall-mount kit included. Optional floor-standing pedestal available for open-air parking lots.
Requires hardwire connection by a certified electrician to your main electrical panel.
Warranty & Assurance
Warranty & Assurance
2-Year Comprehensive Warranty.
We cover all internal component failures. If a fault occurs, we provide remote diagnosis and free replacement units or parts. No return shipping required for confirmed defects.
Shipping & Lead Time
Shipping & Lead Time
Factory Direct Shipping.
• Processing (QC): 3-5 Business Days
• Global Transit: 8-15 Business Days
• Tracking provided via email upon dispatch.
Global Shipping & Fulfillment
Factory Direct Logistics: Estimated Total Turnaround 12-27 Business Days.
🏭 The Factory Direct Process
To ensure safety and performance, every ChargePapa unit undergoes a rigorous load-testing sequence before dispatch. We prioritize quality control over instant shipping.
PART 1 Handling Time (4 - 7 Days)
A. QC & Processing
3-5 Days
Bench testing, high-voltage safety check, and calibration.
B. Packing & Flight Booking
1-2 Days
Reinforced protective packaging and air cargo space reservation.
PART 2 Transit Time (8 - 20 Days)
Global Transport
8-20 Days
International transport via Air Freight, Sea Freight, or Land (depending on region).
Logistics & Protection
All international orders are automatically insured against loss or damage. We handle claims with transport partners—no extra cost to you.
We utilize a combination of Air, Sea, and Land transport networks to ensure secure delivery to your specific address.
Tracking numbers are generated after Part 1 (Handling) is complete. Please allow up to 7 days to receive your active code.
We handle export paperwork. However, specific local import duties or taxes are the recipient's responsibility.
* Orders placed on weekends or holidays will be processed the following business day.
* During high-volume periods (like Black Friday or New Year), handling and transit may take extra days.
* Neither party shall be liable for delays resulting from force majeure events (natural disasters, strikes, customs holds, etc.).
Tracking update taking longer than 7 days?
Contact our logistics team for a status check.
✉ info@chargepapa.com
Installation Guide
Installation Guide
with 22kW it tops up much faster at night than my old setup, and I’m totally fine with that Needed a little bit of setup but nothing stressful at all, and Im cool with it
for me Works well as a shared charger in our small apartment garage, and Im totally fine with that
